Date: | 06 02 1927 |
---|---|
Description: | An interior view of the Capitol Theatre as it is being built at 211 State Street, as viewed from the stage toward the balcony. |
Date: | 06 03 1927 |
---|---|
Description: | An interior view of the Capitol Theatre auditorium and balcony under construction. |
Date: | 08 15 1929 |
---|---|
Description: | A crew of telephone line repairmen working on a rural line with their International truck parked below them. An IH truck, with storage compartments sitting... |
Date: | 08 15 1929 |
---|---|
Description: | Telephone line repairmen preparing to work on a residential line. One is climbing a ladder and the other is setting up a soldering unit. Their Internationa... |
Date: | 03 1924 |
---|---|
Description: | Man sitting on a crate milking a cow by hand inside a barn on the farm of Hal Ament. |
Date: | 10 01 1928 |
---|---|
Description: | View looking south showing driveway, parking lot and north side of loading dock at rear of building. |
Date: | 01 02 1929 |
---|---|
Description: | Interior view of first floor lobby with construction debris and some tile work completed on the floor. In the background a man is standing on a ladder near... |
Date: | 12 27 1929 |
---|---|
Description: | Four men laying Novoid Corkboard on the roof of the Tenney Building, located at 110 East Main Street. |
Date: | 10 01 1929 |
---|---|
Description: | State Bank of Wisconsin addition from the rear, 1 W. Main Street, under construction. "J.H. Kelly general contractor." |
Date: | 09 04 1929 |
---|---|
Description: | Addition to State Bank of Wisconsin under construction, with construction workers. 1 W. Main Street. |
Date: | 10 09 1929 |
---|---|
Description: | Interior of Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, looking north west. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 08 01 1929 |
---|---|
Description: | Originally the Evangelical Association's Immanuel Church, 106 North Hamilton Street, which was converted into a waiting room for the Jackson Clinic shown t... |
Date: | 07 10 1929 |
---|---|
Description: | Construction of Capital Buick Co. garage, 754 E. Washington Avenue at N. Livingston Street. |
Date: | 07 03 1929 |
---|---|
Description: | Nilles Hardware and Paints Co., 2330 Atwood Avenue, interior. |
Date: | 07 03 1929 |
---|---|
Description: | Interior view of the Nilles Hardware and Paints Co., 2330 Atwood Avenue. |
Date: | 03 12 1929 |
---|---|
Description: | Concrete block machine as seen from the front, at Madison Silo Co. |
Date: | 09 26 1928 |
---|---|
Description: | Tanks at Hydraulics Laboratory, 660 N. Park Street, before moving, taken from west on cribbing, at the University of Wisconsin. |
Date: | 11 20 1927 |
---|---|
Description: | Harrison Smith house, 523 Farwell Drive, Maple Bluff. |
Date: | 09 04 1926 |
---|---|
Description: | Orpheum Theater construction, 216 State Street, from stage, looking south. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: