Date: | |
---|---|
Description: | Two men in the process of butchering three large hogs. The hogs hang off of hooks from a track on the ceiling of the slaughterhouse. The man on the right c... |
Date: | |
---|---|
Description: | Male stock yard farmers wearing overall bibs, hats, and buttons are standing and sitting around inside a large room. On the left, a man dressed in a button... |
Date: | |
---|---|
Description: | A male employee wearing an apron, hat, and gloves, is standing in a room full of slaughtered pigs hanging from hooks on the ceiling. The employee is examin... |
Date: | |
---|---|
Description: | Four male Oscar Mayer employees dressing (gutting) slaughtered pigs in a cooler processing room. |
Date: | |
---|---|
Description: | An Oscar Mayer employee is arranging pork onto a conveyor belt leading into a cutting machine, which is slicing the ribs. On the machine is a logo which re... |
Date: | |
---|---|
Description: | Close-up of an Oscar Mayer employee trimming fat from pork with a large knife. He is wearing an apron, and a cut resistant glove on one of his hands. |
Date: | |
---|---|
Description: | Close-up of an Oscar Mayer employee wearing cut resistant gloves using a large knife to trim fat from a slab of pork. |
Date: | |
---|---|
Description: | View towards a group of women standing in the foreground on either side of a conveyer belt. The women are stamping Oscar Mayer logos into packaged slabs of... |
Date: | |
---|---|
Description: | View towards a male employee wearing a hat and rubber apron. He is using a pitchfork to put meat through a meat processing machine, which is emptying into ... |
Date: | |
---|---|
Description: | Long lines of pig carcasses left over from dressing are hanging on a rack of hooks attached to the ceiling. Inspection stamps and tags are on the carcasses... |
Date: | |
---|---|
Description: | View of a room full of pigs which are being cooled off by a sprinkler system installed along the indoor pen. |
Date: | |
---|---|
Description: | View of a room where pigs are being cooled off by a sprinkler system installed above the indoor pen. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: