Date: | 05 28 1913 |
---|---|
Description: | Power dam construction workers pausing during a meal in the camp dining room. Oil lamps are hanging from the ceiling; overhead electric lights are also ins... |
Date: | 07 02 1913 |
---|---|
Description: | Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: