Date: | 1913 |
---|---|
Description: | Workmen stand atop and in front of the remnants of the last remaining wing, the North Wing, of the third Wisconsin State Capitol building. |
Date: | 1910 |
---|---|
Description: | Group portrait of the crew that constructed the Wisconsin State Capitol dome. The new East Wing is visible in the background. |
Date: | 10 22 1934 |
---|---|
Description: | View from street of the workers re-siding a house at 412 W. Mifflin Street. An automobile is parked in front of the garage on the left, and there is a neig... |
Date: | 07 27 1931 |
---|---|
Description: | Group portrait of workmen in front of the Chicago, Milwaukee and St. Paul railroad viaduct (Olin Avenue - US Highway 12) that is under construction. |
Date: | 09 07 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building at 1513 University Avenue under construction. Men are working on the steel framework. A mas... |
Date: | 10 1869 |
---|---|
Description: | The second Wisconsin State Capitol dome under construction, showing the workmen and the equipment they used to hoist construction materials into place. |
Date: | 1899 |
---|---|
Description: | Two stone cutters (probably Italian) working on decorative details over the east entrance during the construction of the State Historical Society of Wiscon... |
Date: | 1912 |
---|---|
Description: | Wisconsin State Capitol under construction, with men and a horse-drawn buggy in the foreground. |
Date: | |
---|---|
Description: | Workers pose on the frame of a barn they are building. |
Date: | 04 22 1948 |
---|---|
Description: | Frank Meyers measuring the floorboard of his 1948 Soap Box Derby racer to see that it compares exactly with the full-scale plans he drew before starting to... |
Date: | 05 09 1948 |
---|---|
Description: | Bishop William P. O'Connor of the Madison Diocese is shown removing the first shovel of dirt at the ground-breaking of the Queen of Apostles Seminary being... |
Date: | 10 02 1948 |
---|---|
Description: | Inside view of the wood scaffolding built over the sidewalk along the South Carroll Street side of the Blied Building, 29 West Main Street. The scaffolding... |
Date: | 10 31 1948 |
---|---|
Description: | Bishop William P. O'Connor applies a trowel of fresh cement to a base for the cornerstone of the new Queen of Apostles seminary, 5810 Cottage Grove Road. L... |
Date: | 10 31 1948 |
---|---|
Description: | Rt. Rev. Adaltbert Turowski, Vatican City, Rome, father general of the Catholic Pallottine Order which will operate the seminary, shown addressing the audi... |
Date: | 11 23 1948 |
---|---|
Description: | This ceremony at Truax Field signaled the start of construction of the 120-unit apartment project for war veterans by the Madison Housing Authority. Henry ... |
Date: | 12 11 1948 |
---|---|
Description: | Bishop William P. O'Connor is laying the cornerstone for Our Lady Queen of Peace church and school. Flanking him are, left to right, the Very Rev. Edward N... |
Date: | |
---|---|
Description: | View of workers and supervisors during construction of the skywalk across Baldwin Street at the Gisholt plant. The floor is covered in plastic. The renovat... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: