Date: | |
---|---|
Description: | Slightly elevated view of men working on the Kilbourn dam. |
Date: | 05 05 1911 |
---|---|
Description: | Elevated view of construction on Arpin's dam. Men are working on the right. Caption reads: "Arpin's Dam at Radisson, Wis". |
Date: | 1895 |
---|---|
Description: | Munger's Mill and dam, with men standing on and around the dam. |
Date: | 1913 |
---|---|
Description: | View looking down on construction site of a dam. Two pulley-operated hoists are erect. Men pose from the top of the dam. |
Date: | |
---|---|
Description: | View from railroad tracks towards industrial activity on the edge of the river, possibly building a dam. |
Date: | |
---|---|
Description: | Men working on the foundation of a building, possibly laying a foundation for the post-flood business district dam. |
Date: | 1900 |
---|---|
Description: | View across water of men working to construct a brush dam about seven miles north of Cassville. There are two groups of well-dressed people, who appear to ... |
Date: | 1913 |
---|---|
Description: | Elevated view of a power dam on the Wisconsin River under construction. There is a rowboat in the foreground. On the opposite shoreline are trees and bluff... |
Date: | |
---|---|
Description: | Outdoor view of the construction of a large building on top of a dam. Location identified as the construction of the powerhouse on the canal in Hatfield. |
Date: | 1907 |
---|---|
Description: | Elevated view across rushing water towards a construction site of a dam on a river. Identified as the construction of the Hatfield Dam, looking northwest. |
Date: | |
---|---|
Description: | Outdoor view of a construction site of large pipes and other building materials. Identified as the construction site of the powerhouse at the Hatfield dam ... |
Date: | 1935 |
---|---|
Description: | An elevated, panoramic view of the construction of the Norris Dam. Portions of the image are labeled. |
Date: | 1935 |
---|---|
Description: | Panoramic view of the construction of the Norris Dam, looking upstream. On the left the text reads: "West Bank," and on the right it reads: "East Bank." |
Date: | 12 13 1938 |
---|---|
Description: | Elevated, panoramic view of the Wheeler Dam from the south side of the Tennessee River. |
Date: | 08 01 1936 |
---|---|
Description: | Elevated, panoramic view of the Pickwick Dam under construction. |
Date: | 03 24 1937 |
---|---|
Description: | Elevated, panoramic view of the construction of the Pickwick Dam power house and spillway. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: