Date: | |
---|---|
Description: | Barn raising. The foundation is constructed from local fieldstone or "pudding stone," found in the nearby fields. A large group of men are is posing holdin... |
Date: | 05 02 1927 |
---|---|
Description: | Side view from the roof of Kruse's store, towards the Capitol Theatre under construction, of steel frame of structure. |
Date: | 07 23 1931 |
---|---|
Description: | Capital Times model home under construction at 2318 Monroe Street. |
Date: | |
---|---|
Description: | Two men shaking hands while working to complete structural steel work on the Wisconsin State Capitol. |
Date: | 1909 |
---|---|
Description: | Workmen posing on the partially demolished dome of the third Wisconsin State Capitol, together with the hoist used for removing salvaged materials. This d... |
Date: | 1963 |
---|---|
Description: | A man excavating with a British built International BTD-6 crawler tractor and Drott bucketloader in front of the west facade of St. Paul's Cathedral in Lon... |
Date: | 1937 |
---|---|
Description: | Worker moving rock at the Sahara Mine with an International T-40 TracTracTor (crawler tractor) equipped with a Bucyrus-Erie bullgrader. |
Date: | 08 25 1967 |
---|---|
Description: | Construction workers enjoying a beer after pouring concrete for a bridge structure. |
Date: | |
---|---|
Description: | Elevated view of Kilbourn Dam, building apron. Men are working on the dam, and a bridge is in the background. |
Date: | |
---|---|
Description: | Slightly elevated view of men working on the Kilbourn dam. |
Date: | 08 19 1925 |
---|---|
Description: | Workers are removing dirt for the construction of the New York City subway with a Bucyrus shovel loader and an International truck. The workers are below s... |
Date: | 1900 |
---|---|
Description: | Elevated view of construction workers and brick layers nearing completion of construction of the Twine Mill at the McCormick Reaper Works. The factory was ... |
Date: | 1883 |
---|---|
Description: | The third Wisconsin State Capitol after the unfinished South Wing collapsed on November 8, 1883. Defective workmanship and shoddy construction materials ca... |
Date: | 1910 |
---|---|
Description: | Group portrait of the crew that constructed the Wisconsin State Capitol dome. The new East Wing is visible in the background. |
Date: | 1905 |
---|---|
Description: | Construction crew building a double streetcar track around the Capitol Square on North Pinckney Street. The oversized awnings were common around the Square... |
Date: | 11 10 1937 |
---|---|
Description: | Castle & Doyle Rex Moto Mixer truck delivering ready mixed concrete in the alley behind Dean Clinic, 113-115 N. Carroll Street, with five men looking on. |
Date: | 12 19 1936 |
---|---|
Description: | View across street towards a three-story house on Bernard Court. The address on the door reads "202," and a sled is leaning up against the wall near the fr... |
Date: | 10 27 1936 |
---|---|
Description: | Elevated view of a construction crew working on Chicago & Northwestern Railroad crossing, showing the W.R. Baker Tavern at 601 E. Wilson Street, and the Pa... |
Date: | 05 10 1935 |
---|---|
Description: | View looking up towards a man laying new shingles on the roof of a house at 341 West Wilson Street. |
Date: | 06 20 1933 |
---|---|
Description: | Group portrait of eleven workers installing Plibrico Jointless Firebrick in front of a steam locomotive parked beside Fauerbach Brewery and used to provide... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: