Date: | 1910 |
---|---|
Description: | St. Josaphat's Church in Milwaukee under construction. |
Date: | 1910 |
---|---|
Description: | Construction workers are posed in front of the partially-built St. Josaphat's Church on scaffolding and wooden steps near large columns. There are two chil... |
Date: | 09 11 1947 |
---|---|
Description: | Mt. Olive Lutheran Church, 4018 Mineral Point Road, is shown under construction. |
Date: | |
---|---|
Description: | Construction of a mikveh (ritual bath) by religious Jews; Neu Freimann D.P. camp; Munich. Saul Sorrin was interviewed as part of the Wisconsin Survivors ... |
Date: | 09 08 1953 |
---|---|
Description: | Carpenters install a four-story wall to close off the front of the St. Raphael's sanctuary during the remodeling project that will rebuild the sanctuary an... |
Date: | 06 1967 |
---|---|
Description: | Composite panoramic view of the south side of the 700 block of State Street. Lake Street parking ramp and University of Wisconsin Extension building are vi... |
Date: | 03 1979 |
---|---|
Description: | "With the Catholic Church steeple looming in the background, Schuster Construction men work on the Widmer Cheese Factory chimney." |
Date: | 03 1979 |
---|---|
Description: | "Mason, Reuben Schuster, lays brick on the Widmer Cheese Factory chimney." |
Date: | 11 1993 |
---|---|
Description: | "High winds played havoc with the cross on St. Peter's Lutheran Church. Steeplejack, Tim McNitt, of Kiel was called in to rectify the 'leaning cross.'" |
Date: | 11 1993 |
---|---|
Description: | "High winds played havoc with the cross on St. Peter's Lutheran Church. Steeplejack, Tim McNitt, of Kiel was called in to rectify the 'leaning cross.'" |
Date: | 11 1993 |
---|---|
Description: | "High winds played havoc with the cross on St. Peter's Lutheran Church. Steeplejack, Tim McNitt, of Kiel was called in to rectify the 'leaning cross.'" |
Date: | 11 1993 |
---|---|
Description: | "High winds played havoc with the cross on St. Peter's Lutheran Church. Steeplejack, Tim McNitt, of Kiel was called in to rectify the 'leaning cross.'" |
Date: | 11 1993 |
---|---|
Description: | "High winds played havoc with the cross on St. Peter's Lutheran Church. Steeplejack, Tim McNitt, of Kiel was called in to rectify the 'leaning cross.'" |
Date: | 08 09 1961 |
---|---|
Description: | The foundations of a new home for the Christ Presbyterian Church rise at N. Brearly and E. Gorham Streets. The new church will replace the church currently... |
Date: | 01 29 1964 |
---|---|
Description: | The framework of the new East Side Evangelical Lutheran Church at 2310 Independence Lane in process of being built. One construction worker is shown at wor... |
Date: | 06 09 1965 |
---|---|
Description: | A robin sitting peacefully on her nest on a railing of the choir loft of a church in the midst of construction. Workmen are seen in the background. The chu... |
Date: | 1951 |
---|---|
Description: | Exterior view of the Beth Israel Center synagogue during construction. A worker is standing on the roof of the building, and construction materials are pil... |
Date: | 08 20 1958 |
---|---|
Description: | The new Catholic Parish Center adjoining the newly redecorated St. Patrick's Church on east Main street. The two-story building will contain rectory office... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: