Date: | 07 29 1955 |
---|---|
Description: | Interior of sanctuary of Our Lady Queen of Peace Catholic Church, 401 South Owen Drive, during construction. |
Date: | 06 05 1946 |
---|---|
Description: | A Safway Steel Scaffold at the Capitol Heat and Power Plant, 624 East Main Street. Safway Steel Scaffolds Company, offices at 940 Williamson Street, is an ... |
Date: | 09 11 1947 |
---|---|
Description: | Mt. Olive Lutheran Church, 4018 Mineral Point Road, is shown under construction. |
Date: | 12 20 1947 |
---|---|
Description: | Exterior view of the new building for radio station WIBA under construction. There are piles of snow and building supplies around an entrance. |
Date: | 08 1948 |
---|---|
Description: | Scaffolding set up for the construction of a screen for the Badger Outdoor Theater. The photograph was taken for the Safway Steel Scaffolds Company, 940 Wi... |
Date: | 10 02 1948 |
---|---|
Description: | View of the Blied Building, 29 West Main Street, showing the South Carroll Street facade with a wood scaffold built over the sidewalk. The scaffolding was... |
Date: | 10 02 1948 |
---|---|
Description: | Inside view of the wood scaffolding built over the sidewalk along the South Carroll Street side of the Blied Building, 29 West Main Street. The scaffolding... |
Date: | 11 17 1948 |
---|---|
Description: | Construction scene of the Canada Dry Bottling Company building at 3396 University Avenue. Frenchy's restaurant is in the background. |
Date: | 11 17 1948 |
---|---|
Description: | Construction scene of the new enzyme laboratory at 1710 University Avenue. |
Date: | 11 17 1948 |
---|---|
Description: | The nearly completed Madison fire station number 8, 409 North Street. There is a man on the roof holding a rope. |
Date: | 10 30 1949 |
---|---|
Description: | As the cornerstone of Beth Israel Center was lowered into place, representatives of the oldest Madison Jewish congregation participated in the ceremony. Th... |
Date: | 11 29 1949 |
---|---|
Description: | Reverend Charles R. Bell Jr., pastor of the First Baptist church, breaks ground for the new Baptist Church to be constructed at 518 North Franklin Avenue a... |
Date: | 03 23 1950 |
---|---|
Description: | A large steel cylinder-shaped water reservoir stands above a drilled well with a tall construction crane behind it. The well under construction is Unit #9 ... |
Date: | 06 30 1950 |
---|---|
Description: | Elevated view of construction of new concrete bleachers at the north end of Camp Randall Stadium. |
Date: | 06 30 1950 |
---|---|
Description: | View of the north bleachers at Camp Randall Stadium, with construction started to add additional concrete bleachers on top. |
Date: | 08 17 1950 |
---|---|
Description: | A construction crane and concrete base footings are laid out at ground level in preparation for the start of a seven-story addition to Madison General Hosp... |
Date: | 06 18 1952 |
---|---|
Description: | William F. Guethlein, Sauk City, resting on a scaffold on the Belmont Hotel, 31 North Pinckney Street. He has been repairing and painting the hotel windows... |
Date: | 06 22 1953 |
---|---|
Description: | Former Governor Oscar Rennebohm turns the first shovelful of earth for the new Eagles Hall to be built on the site of the old Marquette School at 1232 Jeni... |
Date: | 09 08 1953 |
---|---|
Description: | Carpenters install a four-story wall to close off the front of the St. Raphael's sanctuary during the remodeling project that will rebuild the sanctuary an... |
Date: | 12 21 1953 |
---|---|
Description: | Henry J. Bennett and Lester Schultz installing lights on the state Yule tree from a scaffold in the rotunda of the State Capitol. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: