Date: | 02 07 1938 |
---|---|
Description: | Handwritten on back: "7. A pile of completed split shingles. 7500 of these were made for the slave cabin and the mill." |
Date: | 02 07 1938 |
---|---|
Description: | A man is making split shingles. Handwritten on back: "5. A thin section of block being split to shingle thickness with the aid of the frow[sic]." |
Date: | 02 07 1938 |
---|---|
Description: | Two men are sawing a log. Handwritten on back: "1. Sawing white oak log the required length." |
Date: | 02 07 1938 |
---|---|
Description: | Handwritten on back: "2. Man at right is taking out the heart wood. 6. Man at left is finishing completed shingles with draw knife." |
Date: | 02 07 1938 |
---|---|
Description: | Two men working outdoors making split shingles. |
Date: | 02 15 1938 |
---|---|
Description: | Handwritten on back: "View of head gate entrance taken from outside of dam. Note hand hewn locust posts." |
Date: | 02 15 1938 |
---|---|
Description: | Interior view of stone fireplace downstairs. There are andirons inside the fireplace. Debris is on the floor. There is an unopened bag of Atlas cement near... |
Date: | 02 15 1938 |
---|---|
Description: | Two men are standing on the stone wall, and another man is standing on scaffolding inside the dam. In the foreground are large stones, logs, and water. Han... |
Date: | 02 15 1938 |
---|---|
Description: | A group of men are working on the dam. Handwritten on back: "Outside of Dam wall at center." |
Date: | 02 15 1938 |
---|---|
Description: | Handwritten on back: "View of head gate entrance leading to mill race taken from inside of dam." |
Date: | 03 26 1938 |
---|---|
Description: | View of exterior chimney at end of slave cabin. Scaffolding is along the side of the building on the right, and stone and wood debris is in the foreground.... |
Date: | 03 26 1938 |
---|---|
Description: | View towards side of slave log cabin which has a peaked roof. A ladder is set up for access to the roof. Scaffolding is on the left and right ends of the b... |
Date: | 03 26 1938 |
---|---|
Description: | Handwritten on back: "Spillway Gate in upper end of mill race." |
Date: | 03 26 1938 |
---|---|
Description: | View from road toward two men are working on the mill building. There is a barn and silo in the background on the right. Handwritten on back: "Mill buildin... |
Date: | 03 26 1938 |
---|---|
Description: | Handwritten on back: "Lower end of tail race." The Blacksmith Shop is on the far left, and the reconstruction of the mill is just behind it. In the center ... |
Date: | 03 26 1938 |
---|---|
Description: | A man is working near the mill. Handwritten on back: "South side of mill showing pit for water wheel." |
Date: | 03 26 1938 |
---|---|
Description: | A man is sitting on the right looking down at the spillway. Buildings are in the background. Handwritten on back: "Mill building — note pillar to support o... |
Date: | 03 26 1938 |
---|---|
Description: | Two men are looking toward the back of the mill building which is on the right. Behind the man on the right is the Blacksmith Shop. In the distance are fen... |
Date: | 03 26 1938 |
---|---|
Description: | View towards front and right side of the log building with peaked roof and brick chimney. The front has a door and window opening, and another window in th... |
Date: | 03 26 1938 |
---|---|
Description: | View towards side of cabin, which has a door and window opening in the log structure. Scaffolding is set up around the building, and tools and building mat... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: