Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 05 03 1912 |
---|---|
Description: | Workmen on a barge using a pulley to raise sheet steel pilings which were damaged by high water in October, 1911. |
Date: | 05 17 1913 |
---|---|
Description: | Progress on the power house construction, with the east portion of the wall complete, and men working on forms for the rest of the wall. |
Date: | 05 28 1913 |
---|---|
Description: | Workmen on temporary walkways among reinforcing bars on the roof of the power house. |
Date: | 10 10 1913 |
---|---|
Description: | Workers posing with roof trusses on the power house, 85 feet above the water level at the Prairie du Sac Dam. Note the brickwork in progress. |
Date: | 03 12 1914 |
---|---|
Description: | Office force and foremen posing in front of the south side of the power house at the Prairie du Sac dam. |
Date: | 03 12 1914 |
---|---|
Description: | The office force and foremen posing before the south facade of the power house at the Prairie du Sac dam. |
Date: | 10 11 1914 |
---|---|
Description: | Elevated view looking east across the power house, lock, and uncompleted portion of the dam. The concrete plant is seen on the far bank. The rising water o... |
Date: | 07 02 1913 |
---|---|
Description: | Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left. |
Date: | 1942 |
---|---|
Description: | Two men talking on a construction site, probably at International Harvester's Bettendorf Tank Arsenal (factory). A pile of bricks is in the foreground alon... |
Date: | |
---|---|
Description: | Men working around a small building near the construction site of a dam. Two men are standing on the roof. Houses and other buildings are on a hill in the ... |
Date: | 1912 |
---|---|
Description: | Men working on the construction site for Stationary Engine Test Building #24 at International Harvester's Milwaukee Works factory. |
Date: | 04 20 1911 |
---|---|
Description: | Men clearing ground at International Harvester's Milwaukee Works factory for the addition of a six-story machine shop. |
Date: | 08 19 1925 |
---|---|
Description: | Elevated view looking down at men driving dump trucks and operating a steam shovel and a crane below ground level at a construction site. On the opposite s... |
Date: | 03 24 1937 |
---|---|
Description: | Elevated, panoramic view of the construction of the Pickwick Dam power house and spillway. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: