U.W. Mechanical Engineering Building Construction

Date: 10 02 1930
Description: University of Wisconsin Mechanical Engineering Building, under construction, looking northeast, showing scaffolding around building and Findorff Builders s...
Photograph

U.W. Mechanical Engineering Building Construction

Date: 10 02 1930
Description: University of Wisconsin Mechanical Engineering Building, under construction, showing steel framework and scaffolding and Findorff Builders sign, 1513 Unive...
Photograph

U.W. Mechanical Engineering Building Construction

Date: 11 02 1930
Description: University of Wisconsin Mechanical Engineering Building, under construction, showing scaffolding around building and Findorff Builders sign, 1513 Universit...
Photograph

U.W. Mechanical Engineering Building Construction

Date: 11 02 1930
Description: Elevated view of the University of Wisconsin Mechanical Engineering Building, under construction, showing workers on the roof, 1513 University Avenue, look...
Photograph

U.W. Mechanical Engineering Building Construction

Date: 06 07 1930
Description: University of Wisconsin Mechanical Engineering Building. The foundation is under construction, showing engineering shop buildings in the background. 1513 U...
Photograph

U.W. Mechanical Engineering Building Construction

Date: 07 02 1930
Description: University of Wisconsin Mechanical Engineering Building, under construction, showing steel framework, 1513 University Avenue.
Photograph

U.W. Mechanical Engineering Building Construction

Date: 08 01 1930
Description: University of Wisconsin Mechanical Engineering Building, under construction, showing steel framework, 1513 University Avenue.
Photograph

University of Wisconsin-Madison Mechanical Engineering Building Construction

Date: 09 02 1930
Description: University of Wisconsin-Madison Mechanical Engineering Building under construction with steel framework visible, 1513 University Avenue, looking northeast.
Photograph

Narrow Gauge Trestle and Coffer Dam Under Construction

Date: 06 21 1911
Description: Looking east over the Wisconsin River showing the unfinished narrow gauge railroad trestle. Two steam-driven pile drivers on barges with construction worke...
Photograph

Power Dam Construction Site

Date: 07 27 1911
Description: Elevated view of the power dam construction site on the Wisconsin River from the west shore. The outline of the coffer dam is easily seen. Three steam-pow...
Photograph

Northeast View of Power House Coffer Dam at Power Dam

Date: 08 07 1912
Description: Men excavating within the coffer dam. One man is standing on a high piling. Several steam engines at work fill the air with smoke. The high trestle and fou...
Photograph

Pile Coated with Sand at Power Dam

Date: 03 11 1913
Description: Workers posing by a piling coated with sand suspended from a crane.
Photograph

Generators in Power House at Power Dam

Date: 11 03 1914
Description: Interior view of the power house with the Allis-Chalmers generators installed.
Photograph

Construction Workers at Dam Construction Site

Date: 1915
Description: Elevated view of a group of workers posing on the east bank of the Wisconsin River at the power dam construction site. One man is strumming his shovel like...
Photograph

Construction near City Hall

Date: 1911
Description: East Water Street at Wisconsin Avenue. City Hall is in the background. At the left is the Waldheim and Company Department Store of 407-411 East Water Stree...
Photograph

Electric Railroad and Coffer Dam at Power Dam, Looking West

Date: 08 06 1911
Description: A view following the lower trestle to the west bank. The construction camp buildings, including the office and temporary power plant are seen on the left.
Photograph

Crane Hoisting Gravel into Concrete Mixer

Date: 05 31 1912
Description: Workers maneuvering a load of gravel into a concrete mixer at the plant on the east bank of the river. The east abutment is in the foreground, left.
Photograph

Interior of West Shore Coffer Dam

Date: 07 16 1912
Description: Workers posing inside the coffer dam. The narrow gauge railroad is behind them. One of the pile drivers is in the background. A bare area on the bluff in t...
Photograph

High Bridge and West Shore Coffer Dam

Date: 08 01 1912
Description: Elevated view of the power dam construction site from the west, showing the elevated trestle, coffer dam, and steam pile drivers. The concrete plant is vis...
Photograph

Conduits for Switchboard in Power House

Date: 07 02 1913
Description: Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left.