Date: | |
---|---|
Description: | Barn raising, showing the stone foundation and timbers stacked in a pile in the foreground. A smaller building is on the left behind the tower support for ... |
Date: | 1903 |
---|---|
Description: | View towards a construction site. Individuals are standing high up on top of brick foundations. Identified as the construction of the Omaha cut-off bridge. |
Date: | 1950 |
---|---|
Description: | View across snowy ground towards a section of the church under construction, including sections of stone walls. |
Date: | 04 24 1964 |
---|---|
Description: | Image shows an empty lot on the 400 block of State Street across from Ella's Deli (425 State Street). In the lot are remnants of basement walls and brick r... |
Date: | 1935 |
---|---|
Description: | Men wearing hats and long overcoats are walking toward the camera from the bathhouse at Devil's Lake State Park. Other men in work clothes, members of the ... |
Date: | 1905 |
---|---|
Description: | Two men holding trowels are standing on an improvised scaffold made of wooden kegs and planks while working on a cement block foundation wall. Two other me... |
Date: | 1905 |
---|---|
Description: | A crowd of men, women and children are posing on the beams and floor of a new barn on the Frank von der Sump farm. The barn has a stone foundation. A porti... |
Date: | 1905 |
---|---|
Description: | A crowd of men, women and children are posing on the beams and floor of a new barn on the Frank von der Sump farm. The barn has a stone foundation. A porti... |
Date: | 01 1914 |
---|---|
Description: | Text on front reads: "A vista, St. John's Institute for Deaf Mutes, St. Francis, Wis." An elevated view of the Institute grounds with buildings, streets an... |
Date: | 03 26 1938 |
---|---|
Description: | Handwritten on back: "Lower end of tail race." The Blacksmith Shop is on the far left, and the reconstruction of the mill is just behind it. In the center ... |
Date: | 03 26 1938 |
---|---|
Description: | View of construction of upper end of mill race. The stone wall of the dam is in the background. Handwritten on back: "Upper end of mill race near dam. Noti... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: