Date: | 03 1911 |
---|---|
Description: | Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance. |
Date: | 04 1911 |
---|---|
Description: | Group of men standing on and beside a rail car in front of the main construction office at the site of the Wisconsin River dam. |
Date: | 01 20 1912 |
---|---|
Description: | Elevated view of two men standing on a rail car on the narrow gauge electric railroad crossing the river at the dam construction site. The portion of track... |
Date: | 04 13 1912 |
---|---|
Description: | Workmen operating a steam shovel loading gravel into electric rail cars during construction of the power dam. |
Date: | 05 17 1912 |
---|---|
Description: | Workmen pouring concrete from the elevated railroad into forms below. |
Date: | 05 31 1912 |
---|---|
Description: | Forms have been removed, revealing the newly poured buttresses and apron. A man is pushing a cart on the elevated road. |
Date: | 07 25 1912 |
---|---|
Description: | A boy posing in the excavation site for the power house within the coffer dam. He is standing on the narrow gauge tracks; the high trestle is in the backgr... |
Date: | 10 17 1912 |
---|---|
Description: | Concrete plant at east end of the dam, showing the mixers, crane, and a rail car at the abutment. |
Date: | 11 21 1912 |
---|---|
Description: | Two workmen standing in the outlet of a steel draft tube in the power house, while other men are working above it. Cars are moving along the elevated trest... |
Date: | 04 07 1913 |
---|---|
Description: | Five men, two well-dressed, posing on electric rail cars during construction of the dam. |
Date: | 09 01 1913 |
---|---|
Description: | Elevated view of the power house from the southwest showing progress of the brickwork. Two railroad cars are standing on the railroad extension. Workers ar... |
Date: | 1915 |
---|---|
Description: | Elevated view of a group of workers posing on the east bank of the Wisconsin River at the power dam construction site. One man is strumming his shovel like... |
Date: | 09 30 1912 |
---|---|
Description: | Forms have been removed from the first concrete poured for the power house in the northeast corner of the coffer dam. Men are pouring concrete from rail ca... |
Date: | 1909 |
---|---|
Description: | Elevated view of a work train on railroad tracks on a railroad bridge, over a river, that is under construction. Several workmen are standing and posing on... |