Date: | 1879 |
---|---|
Description: | Three men taking a break during harvesting. Their horse-drawn reaper raked the grain into rows as it cut. In the background are various farmstead buildings... |
Date: | 03 01 1927 |
---|---|
Description: | Early view of the construction of the Capitol Theatre revealing the steel frame of the building. Two men are working on the right. |
Date: | 05 02 1927 |
---|---|
Description: | Side view from the roof of Kruse's store, towards the Capitol Theatre under construction, of steel frame of structure. |
Date: | 07 23 1931 |
---|---|
Description: | Capital Times model home under construction at 2318 Monroe Street. |
Date: | 1900 |
---|---|
Description: | Elevated view of construction workers and brick layers nearing completion of construction of the Twine Mill at the McCormick Reaper Works. The factory was ... |
Date: | 1950 |
---|---|
Description: | People gather around a table of food for the First Unitarian Society's "Work Day". The building was designed by Frank Lloyd Wright and some of the construc... |
Date: | 1936 |
---|---|
Description: | Frank Lloyd Wright conferring with another man on the site of one of his great designs, the Johnson Wax Building. |
Date: | 01 29 1946 |
---|---|
Description: | Schoelkopf Manufacturing Company, 320 North 3rd Street, between East Johnson Street and Pennsylvania Avenue. Louis Schoelkopf invented and manufactured the... |
Date: | 01 10 1939 |
---|---|
Description: | University of Wisconsin Memorial Union Theatre under construction, showing interior with four men on scaffolding. |
Date: | 12 26 1930 |
---|---|
Description: | Rear addition to Wisconsin Telephone Co., 17 S. Fairchild Street. Part of the Loraine Hotel is on the left. |
Date: | 08 01 1928 |
---|---|
Description: | View looking north from corner of Monona Avenue and Wilson Street of front and side of the building, with workmen finishing the basement level. Automobiles... |
Date: | 01 02 1929 |
---|---|
Description: | Interior view of first floor lobby with construction debris and some tile work completed on the floor. In the background a man is standing on a ladder near... |
Date: | 09 07 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building at 1513 University Avenue under construction. Men are working on the steel framework. A mas... |
Date: | 06 07 1930 |
---|---|
Description: | Basement of State Office Building, 1 W. Wilson Street, under construction, facing towards Wilson Street. |
Date: | 03 12 1930 |
---|---|
Description: | The University of Wisconsin-Madison Field House frame under construction, with novoid corkboard being installed on the south bleachers of Camp Randall in t... |
Date: | 09 04 1929 |
---|---|
Description: | Addition to State Bank of Wisconsin under construction, with construction workers. 1 W. Main Street. |
Date: | 08 28 1929 |
---|---|
Description: | Five men are working on the heat tunnel construction for the Lake View TB sanatorium. 1202 Northport Drive. |
Date: | 08 28 1929 |
---|---|
Description: | Steam shovel operators excavate for the construction of the Lake View Tuberculosis Sanitarium boiler house at 1202 Northport Drive. |
Date: | 07 24 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant, 130 Fair Oaks Avenue, view looking south west. |
Date: | 08 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue. Men are pouring a cement floor. |