Date: | 03 12 1930 |
---|---|
Description: | The University of Wisconsin-Madison Field House frame under construction, with novoid corkboard being installed on the south bleachers of Camp Randall in t... |
Date: | 11 05 1911 |
---|---|
Description: | A diver and team working to inspect the coffer dam for underwater damage caused by flooding. |
Date: | 04 12 1912 |
---|---|
Description: | A diver posing with other workmen at the power dam construction site prior to assessing underwater damage. |
Date: | 1932 |
---|---|
Description: | Two men stand at the construction site for International Harvester's exhibit building at the "A Century of Progress" world's fair in Chicago. |
Date: | 1916 |
---|---|
Description: | University of Wisconsin-Madison bleachers at Camp Randall Field undergoing weight test for proper load. They should support 6900 pounds per girder with max... |
Date: | 07 04 1944 |
---|---|
Description: | Band, in full regalia, playing tubas, clarinets and trumpets as well as other instruments, outside at a Fourth of July parade. There is a brick building in... |
Date: | 12 28 1949 |
---|---|
Description: | Four members of the Madison Curling Club inspecting their new clubhouse at Burr Jones Field on East Washington Avenue. Pictured are Dr. Ralph E. Campbell, ... |
Date: | 12 28 1949 |
---|---|
Description: | Two members of the Madison Curling Club inspecting the pipes that will furnish artificial ice at their new clubhouse at Burr Jones Field on West Washington... |
Date: | 06 30 1950 |
---|---|
Description: | Elevated view of construction of new concrete bleachers at the north end of Camp Randall Stadium. |
Date: | |
---|---|
Description: | Each little world has its private Atlas working his ethic in longhand toward the stage set for the point of No Return |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: