Date: | 1937 |
---|---|
Description: | Frank Lloyd Wright, monitoring the construction and testing of load-bearing pylons for the Johnson Wax Building. |
Date: | 1879 |
---|---|
Description: | Three men taking a break during harvesting. Their horse-drawn reaper raked the grain into rows as it cut. In the background are various farmstead buildings... |
Date: | 05 02 1927 |
---|---|
Description: | Side view from the roof of Kruse's store, towards the Capitol Theatre under construction, of steel frame of structure. |
Date: | 06 03 1927 |
---|---|
Description: | Elevated view above State Street of the Capitol Theatre, with construction nearly completed. |
Date: | 07 23 1931 |
---|---|
Description: | Capital Times model home under construction at 2318 Monroe Street. |
Date: | 1900 |
---|---|
Description: | Elevated view of a twine Mill under construction at the McCormick Reaper Works. The factory was owned by the McCormick Harvesting Machine company before 19... |
Date: | 1900 |
---|---|
Description: | Elevated view of construction workers and brick layers nearing completion of construction of the Twine Mill at the McCormick Reaper Works. The factory was ... |
Date: | 09 27 1937 |
---|---|
Description: | Two men consulting a set of plans as part of a store modernization project at an International Harvester dealership. |
Date: | 1950 |
---|---|
Description: | People gather around a table of food for the First Unitarian Society's "Work Day". The building was designed by Frank Lloyd Wright and some of the construc... |
Date: | 1936 |
---|---|
Description: | Frank Lloyd Wright conferring with another man on the site of one of his great designs, the Johnson Wax Building. |
Date: | 11 14 1945 |
---|---|
Description: | Elevated view of Red Dot Foods, Inc., construction project, new addition, 1441 East Washington Avenue. Shows Job Office, J.H. Findorff & Son Builders, and ... |
Date: | 07 20 1931 |
---|---|
Description: | Construction of new overhead bridge — viaduct on US Highway 12 and 18 (West Broadway) across the North Western Railroad tracks near the Royal Airport. |
Date: | 08 01 1928 |
---|---|
Description: | View looking north from corner of Monona Avenue and Wilson Street of front and side of the building, with workmen finishing the basement level. Automobiles... |
Date: | 01 02 1929 |
---|---|
Description: | Interior view of first floor lobby with construction debris and some tile work completed on the floor. In the background a man is standing on a ladder near... |
Date: | 09 07 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building at 1513 University Avenue under construction. Men are working on the steel framework. A mas... |
Date: | 03 12 1930 |
---|---|
Description: | The University of Wisconsin-Madison Field House frame under construction, with novoid corkboard being installed on the south bleachers of Camp Randall in t... |
Date: | 09 04 1929 |
---|---|
Description: | Addition to State Bank of Wisconsin under construction, with construction workers. 1 W. Main Street. |
Date: | 08 28 1929 |
---|---|
Description: | Five men are working on the heat tunnel construction for the Lake View TB sanatorium. 1202 Northport Drive. |
Date: | 08 28 1929 |
---|---|
Description: | Steam shovel operators excavate for the construction of the Lake View Tuberculosis Sanitarium boiler house at 1202 Northport Drive. |
Date: | 08 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue. Men are pouring a cement floor. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: