Date: | 1937 |
---|---|
Description: | Frank Lloyd Wright, monitoring the construction and testing of load-bearing pylons for the Johnson Wax Building. |
Date: | 06 03 1927 |
---|---|
Description: | Elevated view above State Street of the Capitol Theatre, with construction nearly completed. |
Date: | 07 23 1931 |
---|---|
Description: | Capital Times model home under construction at 2318 Monroe Street. |
Date: | 1900 |
---|---|
Description: | Elevated view of a twine Mill under construction at the McCormick Reaper Works. The factory was owned by the McCormick Harvesting Machine company before 19... |
Date: | 1900 |
---|---|
Description: | Elevated view of construction workers and brick layers nearing completion of construction of the Twine Mill at the McCormick Reaper Works. The factory was ... |
Date: | 1950 |
---|---|
Description: | People gather around a table of food for the First Unitarian Society's "Work Day". The building was designed by Frank Lloyd Wright and some of the construc... |
Date: | 08 01 1928 |
---|---|
Description: | View looking north from corner of Monona Avenue and Wilson Street of front and side of the building, with workmen finishing the basement level. Automobiles... |
Date: | 09 07 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building at 1513 University Avenue under construction. Men are working on the steel framework. A mas... |
Date: | 03 12 1930 |
---|---|
Description: | The University of Wisconsin-Madison Field House frame under construction, with novoid corkboard being installed on the south bleachers of Camp Randall in t... |
Date: | 09 04 1929 |
---|---|
Description: | Addition to State Bank of Wisconsin under construction, with construction workers. 1 W. Main Street. |
Date: | 08 28 1929 |
---|---|
Description: | Five men are working on the heat tunnel construction for the Lake View TB sanatorium. 1202 Northport Drive. |
Date: | 08 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue. Men are pouring a cement floor. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 07 10 1929 |
---|---|
Description: | Dane County Tuberculosis Sanatorium under construction, with three men with a steam shovel clearing trees. 1202 Northport Drive. J.P. Cullen, Contractor. |
Date: | 07 10 1929 |
---|---|
Description: | Dane County Tuberculosis Sanatorium under construction, with three men with a steam shovel clearing trees. 1202 Northport Drive. J.P. Cullen, Contractor. |
Date: | 09 14 1929 |
---|---|
Description: | Dane County Tuberculosis Sanatorium. Crane at construction site. 1202 Northport Drive. J.P. Cullen, Contractor. |
Date: | 10 03 1928 |
---|---|
Description: | Quinn Construction Company steam shovel excavating for the First Congregational Church, 1609 University Avenue. There is a house in the background. |
Date: | 03 01 1927 |
---|---|
Description: | Capitol Theatre, 211 State Street, under construction. View from the roof of Kruse's store towards two workmen and the construction house. |
Date: | 04 03 1926 |
---|---|
Description: | Orpheum Theater construction, 216 State Street, looking north, with steam shovel and other equipment. Also shows Holy Redeemer Catholic Church, 128 W. John... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: