Date: | 02 28 1915 |
---|---|
Description: | Elevated view, looking east, of the power house, lock, and dam on the Wisconsin River. |
Date: | 08 19 1915 |
---|---|
Description: | Elevated view of the completed power house and dam, looking east at the north, or upstream, side of the structure. On the far shore, the site of the gravel... |
Date: | 1915 |
---|---|
Description: | Elevated view of a group of workers posing on the east bank of the Wisconsin River at the power dam construction site. One man is strumming his shovel like... |
Date: | 08 06 1911 |
---|---|
Description: | A view following the lower trestle to the west bank. The construction camp buildings, including the office and temporary power plant are seen on the left. |
Date: | 05 17 1912 |
---|---|
Description: | Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in... |
Date: | 07 16 1912 |
---|---|
Description: | Workers posing inside the coffer dam. The narrow gauge railroad is behind them. One of the pile drivers is in the background. A bare area on the bluff in t... |
Date: | 08 01 1912 |
---|---|
Description: | Elevated view of the power dam construction site from the west, showing the elevated trestle, coffer dam, and steam pile drivers. The concrete plant is vis... |
Date: | 09 30 1912 |
---|---|
Description: | Forms have been removed from the first concrete poured for the power house in the northeast corner of the coffer dam. Men are pouring concrete from rail ca... |
Date: | 06 13 1913 |
---|---|
Description: | A view, from the west, of the quarry on Blackhawk Bluff. Gravel from the quarry was used in concrete for the construction of the power plant and dam. |
Date: | 07 02 1913 |
---|---|
Description: | Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left. |
Date: | 05 28 1911 |
---|---|
Description: | Men posing on a barge carrying a steam powered pile driver at work on the coffer dam for the construction of the powerhouse. Caption reads: "Driving Sheet ... |
Date: | 1943 |
---|---|
Description: | Men of the 34th Construction Battalion of Seabees work around a boat dock using an International TD-9 TracTracTor (crawler tractor) at Halavo Seaplane Base... |
Date: | 08 22 1964 |
---|---|
Description: | Two men construct an addition to Mr. Jack Myers' house on Washington Island. |
Date: | |
---|---|
Description: | Elevated view of the camp and valley of the site of the Elephant Butte Dam near Truth or Consequences. There are buildings, roads, railroad tracks, and tra... |
Date: | 1893 |
---|---|
Description: | A depiction of Jerusalem on the day of Jesus' crucifixion. Mount Mizpeh and Emmaus are in the distance. Text at right: "Wanderings Among the Wonders and Be... |
Date: | 01 23 1931 |
---|---|
Description: | View from shoreline of bridge during construction over the icy river. |
Date: | 1931 |
---|---|
Description: | View from shoreline of a crane lifting machinery to workers at the top of the bridge during construction. Words on the crane reads, "Stevens Brothers and S... |
Date: | 1931 |
---|---|
Description: | The entrance to the bridge during construction. A worker works on the side of the bridge on the right. Other workers in the middle of the bridge lay boards... |
Date: | 08 29 1930 |
---|---|
Description: | View from top of new bridge of construction grounds at the bridge site. There are cars carrying building materials on the railroad tracks by the Bridgeport... |
Date: | 03 1932 |
---|---|
Description: | Two International trucks exit a tunnel on a dirt road leading through a canyon during the construction of the Hoover Dam. Two men stand on the top of a squ... |