Date: | 1937 |
---|---|
Description: | Frank Lloyd Wright, monitoring the construction and testing of load-bearing pylons for the Johnson Wax Building. |
Date: | 04 12 1927 |
---|---|
Description: | View from roof of the steel frame of the Capitol Theatre, located at 211 State Street in it's initial construction. The work was done by J.C. Theilacker Co... |
Date: | 04 12 1927 |
---|---|
Description: | Steel frame of the Capitol Theatre, early in its construction. The steel work was done by J.C. Theilacker Co. Milwaukee, American Bridge Company. A church ... |
Date: | 04 02 1927 |
---|---|
Description: | View of the early construction of the Capitol Theatre showing the steel frame of the building. |
Date: | 05 02 1927 |
---|---|
Description: | View of Madison businesses on Henry Street, with steel frame construction of the Capitol Theatre in the background. |
Date: | 06 03 1927 |
---|---|
Description: | Elevated view above State Street of the Capitol Theatre, with construction nearly completed. |
Date: | 07 02 1927 |
---|---|
Description: | Elevated view of the nearly completed Capitol Theatre. Construction scaffolding is in the background. |
Date: | 07 23 1931 |
---|---|
Description: | Capital Times model home under construction at 2318 Monroe Street. |
Date: | 1955 |
---|---|
Description: | Aerial view of Midvale neighborhood under construction near Madison's southwestern city limits. The view is focused on the area bounded by Tokay Boulevard,... |
Date: | 04 02 1927 |
---|---|
Description: | Capitol Theatre at 211 or 213? State Street. Entrance under construction is between Fred W. Kruse Co. and Peoples Clothing Co. stores. |
Date: | 12 02 1929 |
---|---|
Description: | Scaffolding rises on the State Bank of Wisconsin, 1 West Main Street, as an addition is constructed. Automobiles are parked on both sides of the street in ... |
Date: | 11 20 1963 |
---|---|
Description: | A three-year-old poses with a man-sized shovel of soil during a groundbreaking ceremony at the site of a new preschool. Behind him is a large steam shovel. |
Date: | 1912 |
---|---|
Description: | Wisconsin State Capitol (fourth capitol, third in Madison) under construction. View from South Hamilton Street. |
Date: | 1900 |
---|---|
Description: | Elevated view of a twine Mill under construction at the McCormick Reaper Works. The factory was owned by the McCormick Harvesting Machine company before 19... |
Date: | 1900 |
---|---|
Description: | Elevated view of construction workers and brick layers nearing completion of construction of the Twine Mill at the McCormick Reaper Works. The factory was ... |
Date: | 1911 |
---|---|
Description: | View of the construction of the fourth Wisconsin State Capitol. |
Date: | 11 02 1918 |
---|---|
Description: | Residential building site near railroad tracks, looking west. Several houses are under construction. Benham was a "company town" created by International H... |
Date: | 09 10 1945 |
---|---|
Description: | Elevated view of a Findorff truck and earthmover standing ready to excavate for an addition to the Red Dot Foods Incorporated potato chip factory, 1441 Eas... |
Date: | 10 29 1934 |
---|---|
Description: | New employees dormitory under construction at Lake View Sanitorium. |
Date: | 11 09 1927 |
---|---|
Description: | Elevated view of the Service Memorial Institutes fifth floor under construction, 470 N. Charter Street, University of Wisconsin from Charter Street. Showin... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: