Date: | 10 09 1929 |
---|---|
Description: | Interior of Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, looking north west. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 03 03 1912 |
---|---|
Description: | Two women and a man posing among the timber pilings near the east shore of the river. Wooden concrete forms and two buildings are in the background. |
Date: | 05 03 1912 |
---|---|
Description: | Workmen on a barge using a pulley to raise sheet steel pilings which were damaged by high water in October, 1911. |
Date: | 05 28 1913 |
---|---|
Description: | Workmen on temporary walkways among reinforcing bars on the roof of the power house. |
Date: | 11 01 1913 |
---|---|
Description: | Wooden forms are in place for construction of the walls of the lock at the Prairie du Sac dam. The newly constructed power house is on the left. |
Date: | 1954 |
---|---|
Description: | University of Wisconsin-Madison Bacteriology Building, in process of construction on campus. There are cars in a parking lot in the foreground. |
Date: | 1942 |
---|---|
Description: | Two men talking on a construction site, probably at International Harvester's Bettendorf Tank Arsenal (factory). A pile of bricks is in the foreground alon... |
Date: | 1911 |
---|---|
Description: | Elevated view of a cleared section of land for a six-story machine shop at International Harvester's Milwaukee Works factory. Other industrial buildings an... |
Date: | |
---|---|
Description: | Side view of a Slattery Contracting Company worker using a Hough HM Loader for dumping dirt into the back of truck. Industrial buildings are in the backgro... |
Date: | 08 19 1925 |
---|---|
Description: | Elevated view looking down at men driving dump trucks and operating a steam shovel and a crane below ground level at a construction site. On the opposite s... |
Date: | 1935 |
---|---|
Description: | An elevated, panoramic view of the construction of the Norris Dam. Portions of the image are labeled. |
Date: | 08 01 1936 |
---|---|
Description: | Elevated, panoramic view of the Pickwick Dam under construction. |
Date: | 03 24 1937 |
---|---|
Description: | Elevated, panoramic view of the construction of the Pickwick Dam power house and spillway. |
Date: | 12 05 1938 |
---|---|
Description: | Elevated, panoramic view from upstream towards the Guntersville Dam. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: