Date: | 1937 |
---|---|
Description: | Frank Lloyd Wright, monitoring the construction and testing of load-bearing pylons for the Johnson Wax Building. |
Date: | 03 01 1927 |
---|---|
Description: | Early view of the construction of the Capitol Theatre revealing the steel frame of the building. Two men are working on the right. |
Date: | 11 20 1963 |
---|---|
Description: | A three-year-old poses with a man-sized shovel of soil during a groundbreaking ceremony at the site of a new preschool. Behind him is a large steam shovel. |
Date: | 1900 |
---|---|
Description: | Elevated view of construction workers and brick layers nearing completion of construction of the Twine Mill at the McCormick Reaper Works. The factory was ... |
Date: | 09 07 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building at 1513 University Avenue under construction. Men are working on the steel framework. A mas... |
Date: | 03 28 1929 |
---|---|
Description: | Elevated view from the south east of men constructing the concrete forms for the roof of the addition to the University of Wisconsin-Madison hydraulics lab... |
Date: | 10 03 1928 |
---|---|
Description: | Quinn Construction Company steam shovel excavating for the First Congregational Church, 1609 University Avenue. There is a house in the background. |
Date: | 03 01 1927 |
---|---|
Description: | Capitol Theatre, 211 State Street, under construction. View from the roof of Kruse's store towards two workmen and the construction house. |
Date: | 04 03 1926 |
---|---|
Description: | Orpheum Theater construction, 216 State Street, looking north, with steam shovel and other equipment. Also shows Holy Redeemer Catholic Church, 128 W. John... |
Date: | 03 03 1926 |
---|---|
Description: | Orpheum Theater under construction, 216 State Street, looking west. Also shows Holy Redeemer Catholic Church, 128 W. Johnson Street, Holy Redeemer Rectory,... |
Date: | 1910 |
---|---|
Description: | Men, including construction workers, on a building site at International Harvester's Lubertzy Works in Russia. |
Date: | 03 1911 |
---|---|
Description: | Construction workers posing during construction of the main office at the Wisconsin River dam site. |
Date: | 03 1911 |
---|---|
Description: | Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance. |
Date: | 04 14 1911 |
---|---|
Description: | Newly poured concrete abutment on the east shore of the Wisconsin River. Iron reinforcing rods protrude from the concrete. Workmen and the steam-driven cem... |
Date: | 04 1911 |
---|---|
Description: | Group of men standing on and beside a rail car in front of the main construction office at the site of the Wisconsin River dam. |
Date: | 06 19 1911 |
---|---|
Description: | Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the a... |
Date: | 10 07 1911 |
---|---|
Description: | Two men in a boat approaching a wooden gravel bin at the construction site. Other men are watching from atop the structure and from the shore. |
Date: | 03 03 1912 |
---|---|
Description: | Two women and a man posing among the timber pilings near the east shore of the river. Wooden concrete forms and two buildings are in the background. |
Date: | 04 13 1912 |
---|---|
Description: | The concrete mixer standing near the newly poured east shore abutment while men are working nearby. Reinforcing rods protrude from the abutment. |
Date: | 04 13 1912 |
---|---|
Description: | Workmen operating a steam shovel loading gravel into electric rail cars during construction of the power dam. |