Date: | 06 02 1927 |
---|---|
Description: | An interior view of the Capitol Theatre as it is being built at 211 State Street, as viewed from the stage toward the balcony. |
Date: | 10 01 1928 |
---|---|
Description: | View looking south showing driveway, parking lot and north side of loading dock at rear of building. |
Date: | 01 02 1929 |
---|---|
Description: | Interior view of first floor lobby with construction debris and some tile work completed on the floor. In the background a man is standing on a ladder near... |
Date: | 09 04 1929 |
---|---|
Description: | Addition to State Bank of Wisconsin under construction, with construction workers. 1 W. Main Street. |
Date: | 10 09 1929 |
---|---|
Description: | Interior of Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, looking north west. |
Date: | 07 24 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant, 130 Fair Oaks Avenue, view looking south west. |
Date: | 08 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue. Men are pouring a cement floor. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 07 10 1929 |
---|---|
Description: | Construction of Capital Buick Co. garage, 754 E. Washington Avenue at N. Livingston Street. |
Date: | 1915 |
---|---|
Description: | Elevated view of a group of workers posing on the east bank of the Wisconsin River at the power dam construction site. One man is strumming his shovel like... |
Date: | 05 17 1912 |
---|---|
Description: | Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in... |
Date: | 1942 |
---|---|
Description: | Two men talking on a construction site, probably at International Harvester's Bettendorf Tank Arsenal (factory). A pile of bricks is in the foreground alon... |
Date: | 1942 |
---|---|
Description: | Construction site showing an additional to an International Harvester factory, probably the company's Bettendorf Tank Arsenal. |
Date: | 11 29 1949 |
---|---|
Description: | Reverend Charles R. Bell Jr., pastor of the First Baptist church, breaks ground for the new Baptist Church to be constructed at 518 North Franklin Avenue a... |
Date: | 1911 |
---|---|
Description: | Elevated view of a cleared section of land for a six-story machine shop at International Harvester's Milwaukee Works factory. Other industrial buildings an... |
Date: | 08 22 1964 |
---|---|
Description: | Two men construct an addition to Mr. Jack Myers' house on Washington Island. |
Date: | 1900 |
---|---|
Description: | Elevated view of a construction site surrounded by buildings in what appears to be an industrial area. A sign on the building on the left side of reads: "W... |
Date: | 06 22 1953 |
---|---|
Description: | Former Governor Oscar Rennebohm turns the first shovelful of earth for the new Eagles Hall to be built on the site of the old Marquette School at 1232 Jeni... |
Date: | 1932 |
---|---|
Description: | Front view of a three-deck drilling platform mounted on an International truck. The device was used in the interior of the tunnels during construction of t... |
Date: | 1911 |
---|---|
Description: | Three men posing while doing rivet work on the Wisconsin State Capitol dome. All three men have been numbered, in correspondence with the caption. Caption... |