Date: | 1937 |
---|---|
Description: | Frank Lloyd Wright, monitoring the construction and testing of load-bearing pylons for the Johnson Wax Building. |
Date: | 05 02 1927 |
---|---|
Description: | View of Madison businesses on Henry Street, with steel frame construction of the Capitol Theatre in the background. |
Date: | 1914 |
---|---|
Description: | Construction of the north wing of the Wisconsin State Capitol. |
Date: | 1913 |
---|---|
Description: | Workmen stand atop and in front of the remnants of the last remaining wing, the North Wing, of the third Wisconsin State Capitol building. |
Date: | 1925 |
---|---|
Description: | View looking down at workers at work below street level, with cranes and International trucks excavating area for the future New York City subway. On the r... |
Date: | 1950 |
---|---|
Description: | Robert Fischelis and George Griffenhagen assist in the groundbreaking for an addition to the American Pharmaceutical Association headquarters. |
Date: | 1929 |
---|---|
Description: | Workers are looking on as a Bucyrus Erie excavating crane is loading dirt into the bed of an International heavy-duty dump truck. |
Date: | 1912 |
---|---|
Description: | Wisconsin State Capitol (fourth capitol, third in Madison) under construction. View from South Hamilton Street. |
Date: | 08 19 1925 |
---|---|
Description: | Workers are removing dirt for the construction of the New York City subway with a Bucyrus shovel loader and an International truck. The workers are below s... |
Date: | 1907 |
---|---|
Description: | The construction of the East Wing of the new Capitol is underway. This is a view of the North and South Wings and the dome of the Third Wisconsin State Cap... |
Date: | 1911 |
---|---|
Description: | A view of the construction of the fourth Wisconsin State Capitol. |
Date: | 07 20 1914 |
---|---|
Description: | A crane places the gilded bronze statue, "Wisconsin," by Daniel Chester French, on top of the Wisconsin State Capitol dome. |
Date: | 11 02 1918 |
---|---|
Description: | Residential building site near railroad tracks, looking west. Several houses are under construction. Benham was a "company town" created by International H... |
Date: | 05 03 1919 |
---|---|
Description: | Men working around 500 ton bin piers and tipple site of mine no. 2. Benham was a "company town" created by International Harvester for the workers of the W... |
Date: | 05 10 1919 |
---|---|
Description: | Workers digging in a muddy trench near bridge no. 1, mine no. 2. Benham was a "company town" created by International Harvester for the workers of the Wisc... |
Date: | 04 05 1919 |
---|---|
Description: | Men working on a hillside retaining wall to "P tipple" of no. 2 mine. Railroad tracks and houses are below in the distance. Benham was a "company town" cre... |
Date: | 04 05 1919 |
---|---|
Description: | Workers building a retaining wall to "P. tipple" of the no. 2 mine. Benham was a "company town" created by International Harvester for the workers of the W... |
Date: | 03 01 1919 |
---|---|
Description: | Workers digging a "borrow pit" for no. 2 mine with a steam shovel. The men are standing along a set of narrow gauge railroad tracks. Benham was a "company ... |
Date: | 05 05 1919 |
---|---|
Description: | Workers preparing the power house for the addition of a 1250 k.w. turbo generator. A man in the foreground is taking a drink of water from a pail. Benham w... |
Date: | 05 03 1919 |
---|---|
Description: | Workers building a culvert over Maggard's Branch near mine no. 2. Benham was a "company town" created by International Harvester for the workers employed i... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: