Date: | 1925 |
---|---|
Description: | View looking down at workers at work below street level, with cranes and International trucks excavating area for the future New York City subway. On the r... |
Date: | 1907 |
---|---|
Description: | The construction of the East Wing of the new Capitol is underway. This is a view of the North and South Wings and the dome of the Third Wisconsin State Cap... |
Date: | 07 20 1914 |
---|---|
Description: | A crane places the gilded bronze statue, "Wisconsin," by Daniel Chester French, on top of the Wisconsin State Capitol dome. |
Date: | 09 27 1937 |
---|---|
Description: | Two men consulting a set of plans as part of a store modernization project at an International Harvester dealership. |
Date: | 11 02 1918 |
---|---|
Description: | Residential building site near railroad tracks, looking west. Several houses are under construction. Benham was a "company town" created by International H... |
Date: | 09 07 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building at 1513 University Avenue under construction. Men are working on the steel framework. A mas... |
Date: | 09 02 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building under construction with steel framework visible, 1513 University Avenue, looking northeast. |
Date: | 10 1869 |
---|---|
Description: | The second Wisconsin State Capitol dome under construction, showing the workmen and the equipment they used to hoist construction materials into place. |
Date: | 1932 |
---|---|
Description: | Construction of the Hillside, part of the Taliesin Complex. Building debris is piled in front of the building, probably material from the Hillside Home Sch... |
Date: | 1932 |
---|---|
Description: | Workers working on the construction of the drafting studio at the Taliesin Fellowship Complex used by the Taliesin Fellowship. The Romeo and Juliet windmil... |
Date: | 1932 |
---|---|
Description: | Constuction workers working on the construction of the drafting studio at the Taliesin Fellowship Complex. The roof trusses and stone walls are in place. C... |
Date: | 1932 |
---|---|
Description: | Construction of the Hillside drafting studio at the Taliesin Fellowship Complex. The roof trusses are in place and the walls and window openings for the ap... |
Date: | 1899 |
---|---|
Description: | Two stone cutters (probably Italian) working on decorative details over the east entrance during the construction of the State Historical Society of Wiscon... |
Date: | 1935 |
---|---|
Description: | Rear elevation of the Johnson Wax Administration Building during construction. Construction sheds and a crane are visible on the building site. The buildin... |
Date: | 1950 |
---|---|
Description: | Partially erected trusses for the roof of the First Unitarian Society Meeting House designed by Frank Lloyd Wright. |
Date: | |
---|---|
Description: | Members of the Madison First Unitarian Society congregation sorting stones to be used in the construction of the Meeting House. The building was designed b... |
Date: | 05 09 1949 |
---|---|
Description: | Elevated view from Park Hotel Roof of the remodeling of the Blied Building, 29 West Main Street. Other West Main Street businesses visible are Madison Bank... |
Date: | 09 18 1952 |
---|---|
Description: | Drawing of Findorff Lumber & Supply Company building, 601 West Wilson Street. |
Date: | 1969 |
---|---|
Description: | Two construction workers with hard hats at the World Trade Center. |
Date: | 10 24 1955 |
---|---|
Description: | Elevated view of the City County Building under construction. Automobiles are parked in the street and a truck with a semi-trailer is parked in front of a ... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: