Date: | 09 02 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building under construction with steel framework visible, 1513 University Avenue, looking northeast. |
Date: | 10 22 1929 |
---|---|
Description: | Workers posing on the balcony of the State Bank of Wisconsin addition under construction, 1 West Main Street. |
Date: | 08 28 1929 |
---|---|
Description: | Steam shovel operators excavate for the construction of the Lake View Tuberculosis Sanitarium boiler house at 1202 Northport Drive. |
Date: | 04 03 1926 |
---|---|
Description: | Orpheum Theater construction, 216 State Street, looking north with steam shovel. Also shows Holy Redeemer Catholic Church, 128 W. Johnson Street, and Holy ... |
Date: | 10 1869 |
---|---|
Description: | The second Wisconsin State Capitol dome under construction, showing the workmen and the equipment they used to hoist construction materials into place. |
Date: | 1861 |
---|---|
Description: | Wisconsin Territorial Capitol (first in Madison) viewed from State Street. The back wall of the east wing of the replacement capitol (second on the site) c... |
Date: | 1946 |
---|---|
Description: | Aerial view of the University of Wisconsin campus with Lake Mendota on the right. |
Date: | 1882 |
---|---|
Description: | View of Science Hall on the University of Wisconsin Madison campus from the southwest. |
Date: | 1958 |
---|---|
Description: | Aerial view of the construction of the lakeshore dormitories, the recreation facilities and Lake Mendota on the University of Wisconsin Madison campus. |
Date: | 1932 |
---|---|
Description: | Construction of the Hillside, part of the Taliesin Complex. Building debris is piled in front of the building, probably material from the Hillside Home Sch... |
Date: | 1935 |
---|---|
Description: | Interior of the main lobby of the Johnson Wax Building during construction. The building was designed by Frank Lloyd Wright. |
Date: | 1935 |
---|---|
Description: | Interior of the two-story work space in the Johnson Wax Building during construction showing the tapered columns. The building was designed by Frank Lloyd ... |
Date: | 1935 |
---|---|
Description: | Interior of the two-story work space in the Johnson Wax Building during construction looking up to the ceiling. The building was designed by Frank Lloyd Wr... |
Date: | 1935 |
---|---|
Description: | Tapered columns in the Johnson Wax Building during construction. Workmen are working on scaffolding built around one of the columns. The building was desig... |
Date: | 1935 |
---|---|
Description: | An interior view of the construction of the Johnson Wax Building. |
Date: | 1935 |
---|---|
Description: | Exterior of the Johnson Wax Building during construction. The curved wall near the entrance is on the right. A construction shack is at the left. A sign po... |
Date: | 1932 |
---|---|
Description: | Workers working on the construction of the drafting studio at the Taliesin Fellowship Complex used by the Taliesin Fellowship. The Romeo and Juliet windmil... |
Date: | 1932 |
---|---|
Description: | Constuction workers working on the construction of the drafting studio at the Taliesin Fellowship Complex. The roof trusses and stone walls are in place. C... |
Date: | 1932 |
---|---|
Description: | Construction of the Hillside drafting studio at the Taliesin Fellowship Complex. The roof trusses are in place and the walls and window openings for the ap... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: