Date: | 1969 |
---|---|
Description: | A church with a bell tower is in the foreground. The framework of one of the towers of the World Trade Center is in the background. |
Date: | 1969 |
---|---|
Description: | Two construction workers at base of construction site. In the background another worker stands among construction materials. |
Date: | 1969 |
---|---|
Description: | A construction worker wearing a yellow hard hat stands in the foreground. In the background is the steel framework of one of the The World Trade Center tow... |
Date: | 1969 |
---|---|
Description: | View of a large crane that carrying building materials at the construction site of The World Trade Center. |
Date: | 1969 |
---|---|
Description: | Two men talking at the base of the construction site of The World Trade Center. |
Date: | 1969 |
---|---|
Description: | Rear view of a construction worker wearing safety goggles on the back of his yellow hard hat. In the background is the steel framework of one of the towers... |
Date: | 05 09 1948 |
---|---|
Description: | Bishop William P. O'Connor of the Madison Diocese is shown removing the first shovel of dirt at the ground-breaking of the Queen of Apostles Seminary being... |
Date: | 1893 |
---|---|
Description: | View of the Appleton Woolen Mills from the south, circa 1895. The three-story building in the right front was constructed in 1893. The long, two-story bui... |
Date: | 1961 |
---|---|
Description: | View of building under construction from a boat on the river. |
Date: | 03 1953 |
---|---|
Description: | Elevated view of construction of the new building, at Sixth Street and Highland Avenue. The downtown can be seen in the background, including the Schlitz c... |
Date: | 1910 |
---|---|
Description: | Elevated view looking east between Second and Third streets. City Hall is visible in the left center background. Signs and billboards dot several buildin... |
Date: | 10 02 1948 |
---|---|
Description: | View of the Blied Building, 29 West Main Street, showing the South Carroll Street facade with a wood scaffold built over the sidewalk. The scaffolding was... |
Date: | 10 02 1948 |
---|---|
Description: | Inside view of the wood scaffolding built over the sidewalk along the South Carroll Street side of the Blied Building, 29 West Main Street. The scaffolding... |
Date: | 1906 |
---|---|
Description: | View down a wooden sidewalk, next to a dirt road. Some piles of wood are in the road near a portion of the sidewalk that is under construction. |
Date: | 10 31 1948 |
---|---|
Description: | Bishop William P. O'Connor applies a trowel of fresh cement to a base for the cornerstone of the new Queen of Apostles seminary, 5810 Cottage Grove Road. L... |
Date: | 1914 |
---|---|
Description: | The dome is under construction and is just visible over the roof of a commercial building on East Main Street. Signs on the corner building on Main Street ... |
Date: | 11 17 1948 |
---|---|
Description: | Construction scene of the Canada Dry Bottling Company building at 3396 University Avenue. Frenchy's restaurant is in the background. |
Date: | 10 17 1948 |
---|---|
Description: | Construction of the Coca Cola building at 3536 University Avenue. |
Date: | 11 17 1948 |
---|---|
Description: | The new Wisconsin Telephone Company west side exchange building in the 2100 block of Franklin Avenue. |
Date: | 11 17 1948 |
---|---|
Description: | Construction scene of the new enzyme laboratory at 1710 University Avenue. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: