Date: | 1925 |
---|---|
Description: | The corner of State and Fairchild Streets showing Yost-Kessnich's and the Capitol Theatre under construction. |
Date: | 05 02 1927 |
---|---|
Description: | View of Madison businesses on Henry Street, with steel frame construction of the Capitol Theatre in the background. |
Date: | |
---|---|
Description: | Structural steel beams being used in the construction of the Wisconsin State Capitol. |
Date: | 1914 |
---|---|
Description: | Construction of the north wing of the Wisconsin State Capitol. |
Date: | 1913 |
---|---|
Description: | Workmen stand atop and in front of the remnants of the last remaining wing, the North Wing, of the third Wisconsin State Capitol building. |
Date: | 1866 |
---|---|
Description: | The Third Wisconsin State Capitol before the completion of the dome. After all four wings of the Third Capitol were completed, the second Capitol was demo... |
Date: | 1912 |
---|---|
Description: | Wisconsin State Capitol (fourth capitol, third in Madison) under construction. View from South Hamilton Street. |
Date: | 1907 |
---|---|
Description: | The construction of the East Wing of the new Capitol is underway. This is a view of the North and South Wings and the dome of the Third Wisconsin State Cap... |
Date: | 1911 |
---|---|
Description: | A view of the construction of the fourth Wisconsin State Capitol. |
Date: | 07 20 1914 |
---|---|
Description: | A crane places the gilded bronze statue, "Wisconsin," by Daniel Chester French, on top of the Wisconsin State Capitol dome. |
Date: | 1883 |
---|---|
Description: | The third Wisconsin State Capitol after the unfinished South Wing collapsed on November 8, 1883. Defective workmanship and shoddy construction materials ca... |
Date: | 1910 |
---|---|
Description: | Group portrait of the crew that constructed the Wisconsin State Capitol dome. The new East Wing is visible in the background. |
Date: | 09 07 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building at 1513 University Avenue under construction. Men are working on the steel framework. A mas... |
Date: | 09 02 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building under construction with steel framework visible, 1513 University Avenue, looking northeast. |
Date: | 10 22 1929 |
---|---|
Description: | Workers posing on the balcony of the State Bank of Wisconsin addition under construction, 1 West Main Street. |
Date: | 08 28 1929 |
---|---|
Description: | Steam shovel operators excavate for the construction of the Lake View Tuberculosis Sanitarium boiler house at 1202 Northport Drive. |
Date: | 04 03 1926 |
---|---|
Description: | Orpheum Theater construction, 216 State Street, looking north with steam shovel. Also shows Holy Redeemer Catholic Church, 128 W. Johnson Street, and Holy ... |
Date: | 10 1869 |
---|---|
Description: | The second Wisconsin State Capitol dome under construction, showing the workmen and the equipment they used to hoist construction materials into place. |
Date: | 1861 |
---|---|
Description: | Wisconsin Territorial Capitol (first in Madison) viewed from State Street. The back wall of the east wing of the replacement capitol (second on the site) c... |
Date: | 1946 |
---|---|
Description: | Aerial view of the University of Wisconsin campus with Lake Mendota on the right. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: