Date: | 11 01 1945 |
---|---|
Description: | Anchor stokers and Kewaunee boilers, at the RMR Corporation building, 1400 East Washington Avenue. |
Date: | 11 01 1945 |
---|---|
Description: | Anchor stokers and Kewaunee boilers in the Marquette School basement. Taken for Pharo Heating. |
Date: | 11 01 1945 |
---|---|
Description: | Kewaunee boiler and Anchor stoker in the basement of the Women's Building. |
Date: | 11 01 1945 |
---|---|
Description: | Anchor stokers and Kewaunee boilers in the basement of Longfellow School, taken for Pharo Heating. |
Date: | 08 07 1939 |
---|---|
Description: | Howard Sechrest, of Howard Welding & Machine Co., wears goggles and welds in the boiler at the Loraine Hotel. |
Date: | 09 26 1933 |
---|---|
Description: | A.H. Hubbell Company workers build a "Complete Plibrico Jointless Firebrick Lining" brick wall around a boiler in the engine room at Arcade Manufacturing C... |
Date: | 1950 |
---|---|
Description: | A man in work clothes gets ready to shove a log into the fire chamber of a boiler. |
Date: | 06 1944 |
---|---|
Description: | Boiler installed by A.M. Toussaint Heating Company, 204 Winnebago Street, at the German House, 508 North Francis Street. |
Date: | 11 04 1944 |
---|---|
Description: | Unidentified man from A.M. Toussaint, heating contractor, fixing a furnace boiler. |
Date: | 06 1911 |
---|---|
Description: | Workmen pose during construction of the temporary steam power plant at the Prairie du Sac dam. These engines provided electric power for the construction ... |
Date: | 06 21 1911 |
---|---|
Description: | Looking east over the Wisconsin River showing the unfinished narrow gauge railroad trestle. Two steam-driven pile drivers on barges with construction worke... |
Date: | 07 27 1911 |
---|---|
Description: | Elevated view of the power dam construction site on the Wisconsin River from the west shore. The outline of the coffer dam is easily seen. Three steam-pow... |
Date: | 06 13 1904 |
---|---|
Description: | View of men moving boilers on horse-drawn wagons from Fairbanks to Pedro Creek, June 13th, 1904. Caption reads: "Moving First Boilers From Fairbanks To Ped... |
Date: | 07 16 1912 |
---|---|
Description: | Workmen pose around the "big boiler" and engine that power the 12 inch centrifugal pump used to pump out the coffer dam at the power dam construction site. |
Date: | 08 07 1912 |
---|---|
Description: | Men excavating within the coffer dam. One man is standing on a high piling. Several steam engines at work fill the air with smoke. The high trestle and fou... |
Date: | 03 11 1913 |
---|---|
Description: | Workers posing by a piling coated with sand suspended from a crane. |
Date: | 1915 |
---|---|
Description: | Elevated view of a group of workers posing on the east bank of the Wisconsin River at the power dam construction site. One man is strumming his shovel like... |
Date: | 04 22 1911 |
---|---|
Description: | Two men and a boy are posing on rail cars carrying two 150 horse-power boilers for use in the temporary power plant at the dam construction site at Prairie... |
Date: | 08 06 1911 |
---|---|
Description: | A view following the lower trestle to the west bank. The construction camp buildings, including the office and temporary power plant are seen on the left. |
Date: | 05 31 1912 |
---|---|
Description: | Workers maneuvering a load of gravel into a concrete mixer at the plant on the east bank of the river. The east abutment is in the foreground, left. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: