Date: | 11 20 1963 |
---|---|
Description: | A three-year-old poses with a man-sized shovel of soil during a groundbreaking ceremony at the site of a new preschool. Behind him is a large steam shovel. |
Date: | 08 19 1925 |
---|---|
Description: | Workers are removing dirt for the construction of the New York City subway with a Bucyrus shovel loader and an International truck. The workers are below s... |
Date: | 08 28 1929 |
---|---|
Description: | Steam shovel operators excavate for the construction of the Lake View Tuberculosis Sanitarium boiler house at 1202 Northport Drive. |
Date: | 08 22 1929 |
---|---|
Description: | Steam shovel loading a truck as part of road construction in front of Collins Lumber Co., 2308 University Avenue. There is a horse-drawn wagon passing by. ... |
Date: | 07 10 1929 |
---|---|
Description: | Dane County Tuberculosis Sanatorium under construction, with three men with a steam shovel clearing trees. 1202 Northport Drive. J.P. Cullen, Contractor. |
Date: | 07 10 1929 |
---|---|
Description: | Dane County Tuberculosis Sanatorium under construction, with three men with a steam shovel clearing trees. 1202 Northport Drive. J.P. Cullen, Contractor. |
Date: | 08 14 1929 |
---|---|
Description: | Dane County Tuberculosis Sanatorium foundation under construction. 1202 Northport Drive. J.P. Cullen, Contractor. |
Date: | 10 03 1928 |
---|---|
Description: | Quinn Construction Company steam shovel excavating for the First Congregational Church, 1609 University Avenue. There is a house in the background. |
Date: | 04 03 1926 |
---|---|
Description: | Orpheum Theater construction, 216 State Street, looking north, with steam shovel and other equipment. Also shows Holy Redeemer Catholic Church, 128 W. John... |
Date: | 05 03 1927 |
---|---|
Description: | Collapsed back wall of Netherwood's Printing Co., at 519 State Street. |
Date: | 03 03 1926 |
---|---|
Description: | Orpheum Theater under construction, 216 State Street, looking west. Also shows Holy Redeemer Catholic Church, 128 W. Johnson Street, Holy Redeemer Rectory,... |
Date: | 04 03 1926 |
---|---|
Description: | Orpheum Theater construction, 216 State Street, looking north with steam shovel. Also shows Holy Redeemer Catholic Church, 128 W. Johnson Street, and Holy ... |
Date: | 04 13 1912 |
---|---|
Description: | Workmen operating a steam shovel loading gravel into electric rail cars during construction of the power dam. |
Date: | 08 16 1926 |
---|---|
Description: | Men loading an International Model 63 truck with a steam shovel, or crane. The truck is operated by the Plack Transfer Company. The truck has been rigged w... |
Date: | 1929 |
---|---|
Description: | Elevated view of a steam shovel filling the back of an International truck with dirt at an airport construction site. |
Date: | 02 16 1931 |
---|---|
Description: | Wisconsin Foundry & Machine Co. conveyor belt loading gravel into hopper which is filling a C.E. & P.A. Roth truck at their gravel pit, 1910 Roth Street ne... |
Date: | |
---|---|
Description: | A steam shovel loading ore at the Hull Rust Mahoning Mine, the world's largest open pit iron ore mine. Published by J.C. Congdon. |
Date: | 04 24 1957 |
---|---|
Description: | Bulldozers and steam shovels prepare the site for the future University of Wisconsin Observatory site near Pine Bluff. |
Date: | |
---|---|
Description: | View of a construction site, with a ditch in the foreground. Location identified as the fill and reconstruction of Town Creek after the 1911 flood in Black... |
Date: | 08 19 1925 |
---|---|
Description: | View looking down at men standing with trucks near a steam shovel working near a rock face. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: