Date: | 1911 |
---|---|
Description: | Elevated view of the Fourth Capitol and dome under construction, while the north wing of the third Wisconsin State Capitol remains standing on the right. T... |
Date: | 1911 |
---|---|
Description: | The Wisconsin State Capitol (the fourth State Capitol, the third in Madison, 1906 - ) dome under construction. |
Date: | 1911 |
---|---|
Description: | Two men pose on a water tank on top of Building #43 at International Harvester's Milwaukee Works factory, while another man hoists building materials from ... |
Date: | 1911 |
---|---|
Description: | Construction crews erecting a six-story machine shop at International Harvester's Milwaukee Works factory. Men are working on the ground and on an exposed ... |
Date: | 1911 |
---|---|
Description: | Elevated view of construction of building number 43 at International Harvester's Milwaukee Works. The factory building housed a six story machine shop. Men... |
Date: | 1911 |
---|---|
Description: | Elevated view of a cleared section of land for a six-story machine shop at International Harvester's Milwaukee Works factory. Other industrial buildings an... |
Date: | 1911 |
---|---|
Description: | Exterior view of the brick Blue River Township and Grade School under construction. The cost of building was $7,000. |
Date: | 1911 |
---|---|
Description: | Three-story brick school building under construction. Cost of building was $14,000. |
Date: | 1911 |
---|---|
Description: | Southeast elevation of Taliesin I, winter 1911-1912. Construction debris is scattered around the base of the building. |
Date: | 1911 |
---|---|
Description: | Construction crew and observers standing on a scaffold. Trees, a wooden tripod with a block and tackle and the roof of a house are visible in the backgroun... |
Date: | 1911 |
---|---|
Description: | View from ground towards the construction of the dome for the fourth Wisconsin State Capitol building. The 1904 fire that destroyed large sections of the t... |
Date: | 1911 |
---|---|
Description: | Three men posing while doing rivet work on the Wisconsin State Capitol dome. All three men have been numbered, in correspondence with the caption. Caption... |
Date: | 1911 |
---|---|
Description: | View along top of roof towards the fourth State Capitol building under construction, with erection tower and gin pole behind the girders of the dome substr... |
Date: | 1911 |
---|---|
Description: | Construction of the dome for the Fourth Wisconsin State Capitol building. Four men are at working around the girders of the dome. One man is marked with an... |
Date: | 1911 |
---|---|
Description: | Stack of logs with the caption "Piles to be used for extending R.R. to dam site." |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: