Date: | 05 09 1946 |
---|---|
Description: | Site of the new Wisconsin Telephone Company central office building, to be constructed at corner of South Fairchild and West Main Streets. 16 S. Carroll St... |
Date: | 11 14 1945 |
---|---|
Description: | Elevated view of Red Dot Foods, Inc., construction project, new addition, 1441 East Washington Avenue. Shows Job Office, J.H. Findorff & Son Builders, and ... |
Date: | 10 14 1946 |
---|---|
Description: | Wisconsin Telephone Company construction site at rear of Park Hotel taken from southwest showing rear of the hotel and the 115 West Main Street building wi... |
Date: | 02 22 1955 |
---|---|
Description: | Cherokee Heights School under construction by Fritz Construction Company in Crawford Heights, 4301 Cherokee Drive, looking southeast. |
Date: | 02 22 1954 |
---|---|
Description: | Cherokee Heights School under construction by Fritz Construction Company in Crawford Heights, 4301 Cherokee Drive, looking southeast, alternate view. |
Date: | 02 22 1954 |
---|---|
Description: | Cherokee Heights School construction by Fritz Construction Company, in Crawford Heights, 4301 Cherokee Drive, view from the back of the school looking nort... |
Date: | 02 22 1954 |
---|---|
Description: | Cherokee Heights School construction, in Crawford Heights, 4301 Cherokee Drive, by Fritz Construction Company, looking northwest at the back of the school. |
Date: | 12 28 1955 |
---|---|
Description: | Composite showing how the proposed Monona Terrace Auditorium will look against the Madison skyline. |
Date: | 1911 |
---|---|
Description: | Newly constructed office building at construction site, with buggy in attached shed. |
Date: | 1911 |
---|---|
Description: | Newly construced kitchen and dining rooms at the construction camp for the dam on the Wisconsin River. The kitchen building has three ventilators on the ro... |
Date: | 03 1911 |
---|---|
Description: | Construction workers posing during construction of the main office at the Wisconsin River dam site. |
Date: | 03 1911 |
---|---|
Description: | Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance. |
Date: | 04 14 1911 |
---|---|
Description: | Completed two-story wood frame main office building at the site of the Wisconsin River dam. |
Date: | 04 14 1911 |
---|---|
Description: | Newly poured concrete abutment on the east shore of the Wisconsin River. Iron reinforcing rods protrude from the concrete. Workmen and the steam-driven cem... |
Date: | 04 1911 |
---|---|
Description: | Group of men standing on and beside a rail car in front of the main construction office at the site of the Wisconsin River dam. |
Date: | 05 06 1911 |
---|---|
Description: | Workmen posing while erecting the first smokestack at the power plant construction site on the Wisconsin River. Two men have scaled the stack. |
Date: | 06 10 1911 |
---|---|
Description: | Dining rooms and kitchen at the camp on the construction site of the Prairie du Sac dam. Workers and children pose in front of the dining rooms; there are ... |
Date: | 06 19 1911 |
---|---|
Description: | Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the a... |
Date: | 07 01 1911 |
---|---|
Description: | A steam-powered centrifugal sand pump at work on the Wisconsin River during the construction of the power dam. Pilings of the coffer dam are visible in the... |
Date: | 07 20 1911 |
---|---|
Description: | Workmen stand on a barge carrying a steam-powered pile driver. The pilings will form the coffer dam necessary for construction of the power plant on the Wi... |