Date: | 07 23 1931 |
---|---|
Description: | Capital Times model home under construction at 2318 Monroe Street. |
Date: | 12 19 1936 |
---|---|
Description: | View across street towards a three-story house on Bernard Court. The address on the door reads "202," and a sled is leaning up against the wall near the fr... |
Date: | 11 21 1936 |
---|---|
Description: | Three men on scaffolding are installing Capitol Rock Wool insulation, from a R.H. and E.H. Carpenter Inc. truck into a house at 616 N. Carroll Street. |
Date: | 05 10 1935 |
---|---|
Description: | Durfee Brothers Roofing Co. truck in front of a home, Jos. P. Slightam residence) at 341 West Wilson Street, with a roofer installing shingles on the steep... |
Date: | 05 10 1935 |
---|---|
Description: | View looking up towards a man laying new shingles on the roof of a house at 341 West Wilson Street. |
Date: | 04 03 1930 |
---|---|
Description: | Steve Schmidt house under construction in Sherman Park subdivision. The house is located at 1406 Farragut Street. |
Date: | 04 03 1926 |
---|---|
Description: | Orpheum Theater construction, 216 State Street, looking north, with steam shovel and other equipment. Also shows Holy Redeemer Catholic Church, 128 W. John... |
Date: | 03 03 1926 |
---|---|
Description: | Orpheum Theater under construction, 216 State Street, looking west. Also shows Holy Redeemer Catholic Church, 128 W. Johnson Street, Holy Redeemer Rectory,... |
Date: | 03 03 1926 |
---|---|
Description: | Orpheum Theater, 216 State Street, under construction, looking east, showing the back sides of buildings along State Street. |
Date: | 04 03 1926 |
---|---|
Description: | Orpheum Theater construction, 216 State Street, looking north with steam shovel. Also shows Holy Redeemer Catholic Church, 128 W. Johnson Street, and Holy ... |
Date: | 1935 |
---|---|
Description: | Workmen working on the Herbert F. Johnson Residence, "Wingspread," designed by Frank Lloyd Wright. The building was completed in 1937. |
Date: | 10 20 1946 |
---|---|
Description: | Ms. Alvin (Eleanor) Moore, 4219 Doncaster Drive, and her brother and sister-in-law, Mr. and Mrs. Wesley Bakken of Mt. Horeb, installing the roof at the Moo... |
Date: | 06 10 1911 |
---|---|
Description: | Dining rooms and kitchen at the camp on the construction site of the Prairie du Sac dam. Workers and children pose in front of the dining rooms; there are ... |
Date: | 05 31 1912 |
---|---|
Description: | Workmen posing outside the dining hall before dinner. |
Date: | 08 18 1926 |
---|---|
Description: | Construction workers and early construction machinery being driven by horses in a residential neighborhood. |
Date: | 05 28 1913 |
---|---|
Description: | Power dam construction workers pausing during a meal in the camp dining room. Oil lamps are hanging from the ceiling; overhead electric lights are also ins... |
Date: | 07 02 1913 |
---|---|
Description: | Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left. |
Date: | |
---|---|
Description: | Men working around a small building near the construction site of a dam. Two men are standing on the roof. Houses and other buildings are on a hill in the ... |
Date: | 1937 |
---|---|
Description: | Elevated view of construction workers placing rebar in the foundation of a house in preparation for concrete to be poured. |
Date: | 1937 |
---|---|
Description: | Large group of construction workers walking through neighborhood of houses that are in the middle of being constructed. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: