Date: | 07 16 1912 |
---|---|
Description: | Workers posing inside the coffer dam. The narrow gauge railroad is behind them. One of the pile drivers is in the background. A bare area on the bluff in t... |
Date: | 08 01 1912 |
---|---|
Description: | Elevated view of the power dam construction site from the west, showing the elevated trestle, coffer dam, and steam pile drivers. The concrete plant is vis... |
Date: | 09 30 1912 |
---|---|
Description: | Forms have been removed from the first concrete poured for the power house in the northeast corner of the coffer dam. Men are pouring concrete from rail ca... |
Date: | 06 13 1913 |
---|---|
Description: | A view, from the west, of the quarry on Blackhawk Bluff. Gravel from the quarry was used in concrete for the construction of the power plant and dam. |
Date: | 11 01 1913 |
---|---|
Description: | Wooden forms are in place for construction of the walls of the lock at the Prairie du Sac dam. The newly constructed power house is on the left. |