Date: | 03 1913 |
---|---|
Description: | View down steep hill at an ice gorge on a river at a power dam. |
Date: | 03 1911 |
---|---|
Description: | Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance. |
Date: | 1911 |
---|---|
Description: | Newly constructed office building at construction site, with buggy in attached shed. |
Date: | 1911 |
---|---|
Description: | Newly construced kitchen and dining rooms at the construction camp for the dam on the Wisconsin River. The kitchen building has three ventilators on the ro... |
Date: | 03 1911 |
---|---|
Description: | Construction workers posing during construction of the main office at the Wisconsin River dam site. |
Date: | 08 07 1912 |
---|---|
Description: | Men excavating within the coffer dam. One man is standing on a high piling. Several steam engines at work fill the air with smoke. The high trestle and fou... |
Date: | 07 25 1912 |
---|---|
Description: | A boy posing in the excavation site for the power house within the coffer dam. He is standing on the narrow gauge tracks; the high trestle is in the backgr... |
Date: | 11 21 1912 |
---|---|
Description: | Elevated view of the progress of construction within the coffer dam showing the gate guides and draft tubes in place. Concrete forms and chutes, as well as... |
Date: | 10 23 1923 |
---|---|
Description: | Men working on the concrete chutes and elevated trestle. Iron reinforcing bars protrude from the forms. |
Date: | 11 21 1912 |
---|---|
Description: | Workmen posing on and in front of the steel draft tubes. The gate guides are visible on the right. |
Date: | 12 29 1912 |
---|---|
Description: | Elevated view of the progress within the coffer dam showing concrete forms around the draft tubes and gate guides. The high trestle is seen extending to th... |
Date: | 02 08 1913 |
---|---|
Description: | A winter view with workers posing with brush mats at the power dam construction site. The gate guides and high trestle form the background. |
Date: | 03 11 1914 |
---|---|
Description: | Looking upstream (north) through the lock at the Prairie du Sac dam. The power house is on the left. The flow of the river has been diverted through the lo... |
Date: | 09 01 1913 |
---|---|
Description: | Elevated view of the power house from the southwest showing progress of the brickwork. Two railroad cars are standing on the railroad extension. Workers ar... |
Date: | 10 12 1911 |
---|---|
Description: | High water on the Wisconsin River has submerged the coffer dam and trestle. Two pile drivers remain in place. Log pilings are floating near the western sh... |
Date: | 05 17 1913 |
---|---|
Description: | Progress on the power house construction, with the east portion of the wall complete, and men working on forms for the rest of the wall. |
Date: | 11 03 1914 |
---|---|
Description: | Interior view of the power house with the Allis-Chalmers generators installed. |
Date: | 05 10 1912 |
---|---|
Description: | Work progresses on the wooden concrete forms at the east side of the river. The steam-powered pile drivers are also visible. |
Date: | 07 02 1913 |
---|---|
Description: | Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left. |
Date: | 10 10 1913 |
---|---|
Description: | Workers posing with roof trusses on the power house, 85 feet above the water level at the Prairie du Sac Dam. Note the brickwork in progress. |