Date: | 09 14 1922 |
---|---|
Description: | Text on front reads: "On the Wisconsin." Wooded islands on the Wisconsin River as seen from the shore. The opposite shoreline is in the background. The pow... |
Date: | 1959 |
---|---|
Description: | Wooded country lane along the Wisconsin River, covered with new snow and fairy frost. |
Date: | 03 2014 |
---|---|
Description: | View of a tree standing on the bank of the Wisconsin River, framed by the snow and tree-covered hills of the opposite bank. An eagle is sitting in the midd... |
Date: | 1913 |
---|---|
Description: | Elevated view of a power dam on the Wisconsin River under construction. There is a rowboat in the foreground. On the opposite shoreline are trees and bluff... |
Date: | 1922 |
---|---|
Description: | View from shoreline of bridge over the Wisconsin River. In the left lower foreground is a shed, and a rowboat. On the opposite shoreline are farms and fiel... |
Date: | 03 1911 |
---|---|
Description: | Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance. |
Date: | 1911 |
---|---|
Description: | Newly constructed office building at construction site, with buggy in attached shed. |
Date: | 1911 |
---|---|
Description: | Newly construced kitchen and dining rooms at the construction camp for the dam on the Wisconsin River. The kitchen building has three ventilators on the ro... |
Date: | 03 1911 |
---|---|
Description: | Construction workers posing during construction of the main office at the Wisconsin River dam site. |
Date: | 08 07 1912 |
---|---|
Description: | Men excavating within the coffer dam. One man is standing on a high piling. Several steam engines at work fill the air with smoke. The high trestle and fou... |
Date: | 07 25 1912 |
---|---|
Description: | A boy posing in the excavation site for the power house within the coffer dam. He is standing on the narrow gauge tracks; the high trestle is in the backgr... |
Date: | 11 21 1912 |
---|---|
Description: | Elevated view of the progress of construction within the coffer dam showing the gate guides and draft tubes in place. Concrete forms and chutes, as well as... |
Date: | 10 23 1923 |
---|---|
Description: | Men working on the concrete chutes and elevated trestle. Iron reinforcing bars protrude from the forms. |
Date: | 11 21 1912 |
---|---|
Description: | Workmen posing on and in front of the steel draft tubes. The gate guides are visible on the right. |
Date: | 12 29 1912 |
---|---|
Description: | Elevated view of the progress within the coffer dam showing concrete forms around the draft tubes and gate guides. The high trestle is seen extending to th... |
Date: | 08 11 1910 |
---|---|
Description: | The first machinery at work sounding at the site for the power dam. Workmen are posing near the carriage-mounted equipment. A horse-drawn wagon is in the ... |
Date: | 02 08 1913 |
---|---|
Description: | A winter view with workers posing with brush mats at the power dam construction site. The gate guides and high trestle form the background. |
Date: | 03 11 1914 |
---|---|
Description: | Looking upstream (north) through the lock at the Prairie du Sac dam. The power house is on the left. The flow of the river has been diverted through the lo... |
Date: | 09 01 1913 |
---|---|
Description: | Elevated view of the power house from the southwest showing progress of the brickwork. Two railroad cars are standing on the railroad extension. Workers ar... |
Date: | 10 12 1911 |
---|---|
Description: | High water on the Wisconsin River has submerged the coffer dam and trestle. Two pile drivers remain in place. Log pilings are floating near the western sh... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: