Date: | 07 29 1955 |
---|---|
Description: | Interior of sanctuary of Our Lady Queen of Peace Catholic Church, 401 South Owen Drive, during construction. |
Date: | 07 29 1955 |
---|---|
Description: | Interior of sanctuary of Our Lady Queen of Peace Catholic Church, 401 South Owen Drive, during construction. |
Date: | 06 18 1947 |
---|---|
Description: | Ed Gesteland, who is fourteen years old, is shown working on his Soap Box derby racer in the basement of his home at 4221 Wanetah Trail. Behind him, with h... |
Date: | 04 09 1948 |
---|---|
Description: | Building Soap Box Derby racers in the workshop of the Neighborhood House, 768 West Washington Avenue, are Virgil Johnson, son of Mr. and Mrs. Gordon Johnso... |
Date: | 04 22 1948 |
---|---|
Description: | Frank Meyers measuring the floorboard of his 1948 Soap Box Derby racer to see that it compares exactly with the full-scale plans he drew before starting to... |
Date: | 05 06 1948 |
---|---|
Description: | Roddy Botts, son of Mr. and Mrs. R. Chellis Botts, shown adding a small piece of wood to the body of his 1948 racer. He had the most original design in the... |
Date: | 05 09 1948 |
---|---|
Description: | Bishop William P. O'Connor of the Madison Diocese is shown removing the first shovel of dirt at the ground-breaking of the Queen of Apostles Seminary being... |
Date: | 10 02 1948 |
---|---|
Description: | Edmund Sternberg house at 4214 Drexel Avenue in Lake Edge Park. Mr. Sternberg quit his job to build the house himself. Mrs. (Violet Pinneke) Sternberg, who... |
Date: | 10 02 1948 |
---|---|
Description: | View of the Blied Building, 29 West Main Street, showing the South Carroll Street facade with a wood scaffold built over the sidewalk. The scaffolding was... |
Date: | 10 02 1948 |
---|---|
Description: | Inside view of the wood scaffolding built over the sidewalk along the South Carroll Street side of the Blied Building, 29 West Main Street. The scaffolding... |
Date: | 10 31 1948 |
---|---|
Description: | Bishop William P. O'Connor applies a trowel of fresh cement to a base for the cornerstone of the new Queen of Apostles seminary, 5810 Cottage Grove Road. L... |
Date: | 10 31 1948 |
---|---|
Description: | Rt. Rev. Adaltbert Turowski, Vatican City, Rome, father general of the Catholic Pallottine Order which will operate the seminary, shown addressing the audi... |
Date: | 11 17 1948 |
---|---|
Description: | Construction scene of the new Naval Armory in the 1000 block of East Washington Avenue. |
Date: | 11 17 1948 |
---|---|
Description: | Construction scene of the Canada Dry Bottling Company building at 3396 University Avenue. Frenchy's restaurant is in the background. |
Date: | 10 17 1948 |
---|---|
Description: | Construction of the Coca Cola building at 3536 University Avenue. |
Date: | 11 17 1948 |
---|---|
Description: | The new Wisconsin Telephone Company west side exchange building in the 2100 block of Franklin Avenue. |
Date: | 11 17 1948 |
---|---|
Description: | Construction scene of the new enzyme laboratory at 1710 University Avenue. |
Date: | 11 23 1948 |
---|---|
Description: | This ceremony at Truax Field signaled the start of construction of the 120-unit apartment project for war veterans by the Madison Housing Authority. Henry ... |
Date: | 12 12 1948 |
---|---|
Description: | Participants in the ground breaking ceremonies for the new Calvary Gospel church located at 3822 Mineral Point Road. Men standing with shovels, are, from l... |
Date: | 12 11 1948 |
---|---|
Description: | Bishop William P. O'Connor is laying the cornerstone for Our Lady Queen of Peace church and school. Flanking him are, left to right, the Very Rev. Edward N... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: