Date: | 1952 |
---|---|
Description: | Front view looking towarsd a man under an umbrella using a Farmall Super C tractor outfitted with a C-254 cultivator to work in a field. Another man on a t... |
Date: | 10 1981 |
---|---|
Description: | Color photograph of five tractors from International Harvester's "50 Series" on a hillside dirt road. |
Date: | 1979 |
---|---|
Description: | View over fence towards a 1420 axial-flow combine parked in a gravel driveway in front of a farm building. |
Date: | 01 12 1978 |
---|---|
Description: | Slightly elevated right side view of a man operating a 1480 Axial-Flow combine in a cornfield. In the far distance a road, buildings and a silo are visible... |
Date: | |
---|---|
Description: | Man operating TD-20 on a road to move a tree trunk. |
Date: | |
---|---|
Description: | Man operating 240 Utility Tractor with Sweepster. |
Date: | 1963 |
---|---|
Description: | TD-24 pushing Allis Chalmers 260 scraper and Allis Chalmers 45 grader. |
Date: | |
---|---|
Description: | Men driving Pay Haulers on a road at the base of a cliff. In the background is a tall arch cut through the rock of the cliff. |
Date: | 1972 |
---|---|
Description: | Elevated view of Pay Loader and Pay Hauler working to remove rock. D.B. Hill contractors have contract to reconstruct 7.5 miles of route US-65. To move the... |
Date: | 1972 |
---|---|
Description: | View up road towards a man operating a Pay Loader. A Pay Hauler is in the background. D.B. Hill contractors have contract to reconstruct 7.5 miles of route... |
Date: | 1973 |
---|---|
Description: | In the foreground is a man in a 350 Pay Hauler. In the background a Hough Pay Loader is loading material into another 350 Pay Hauler. Morrison-Knudsen Co.,... |
Date: | 1973 |
---|---|
Description: | Elevated view of a man operating a Hough Pay Loader to load material into a 350 Pay Hauler. In the background is another Pay Hauler. Morrison-Knudsen Co., ... |
Date: | 1973 |
---|---|
Description: | Man operating a 433 Pay Scraper. Shepherd Construction Company, Inc., has sub-contract for grading and drainage work on section of Georgia Route 333. |
Date: | 11 12 1971 |
---|---|
Description: | Man operating 295b Pay Scraper on a steep grade, two more are visible in the background. Black Rock Contracting, Inc., has contract to construct 3.26 miles... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: