click zoom to display a high-res image
Men Working on Concrete Forms
Image
A group of workmen posing while working on concrete forms at the Prairie du Sac dam site. Their position high above the water level affords an expansive upstream view of the Wisconsin River.
1914
Eberhart, F. S.
Publication Information
Physical Description
Collection Information
Copyright Information
W012GGL
WHi 48694
Image
Digital Collections
Explore more than 100,000 collection items online through the Society’s digital collections. For over two decades, we’ve been scanning, photographing, and digitizing materials from our collections, creating a rich and growing digital archive that brings history closer to you.
The Wisconsin Historical Society offers an ever-growing digital collection. Digitized materials reflect the full range of items in the collections including photographs, letters, newsletters, films, posters, architectural drawings, menus, and ephemera.
Attribution
For a credit line: Wisconsin Historical Society, Creator, Title, Unique Identifier.
The Unique Identifier can be found at the top or bottom of the page for each item. The name of a downloaded file is NOT the unique identifier.
For bibliographic citations please consult the UW-Madison Libraries Citation Research Guide to ensure compliance with appropriate style guidelines.
Accessing Collections
The vast majority of the items in our collections are not online. The Society owns thousands of archival collections viewable in our Archives reading room. To view and conduct research in our collections, visit us in person.
Shooting Concrete from Elevated Road at Power Dam
May 17, 1912
Workmen pouring concrete from the elevated railroad into forms below.
Concrete Chutes and Forms in Power House Coffer Dam
October 23, 1923
Men working on the concrete chutes and elevated trestle. Iron reinforcing bars protrude from the forms.
Concrete Forms at East End of Power Dam
May 10, 1912
Work progresses on the wooden concrete forms at the east side of the river. The steam-powered pile drivers are also visible.
First Concrete Laid at Power Dam
April 14, 1911
Newly poured concrete abutment on the east shore of the Wisconsin River. Iron reinforcing rods protrude from the concrete. Workmen and the steam-driven cement mixer are also visible.
General View of Power House and Dam
October 11, 1914
Elevated view looking east across the power house, lock, and uncompleted portion of the dam. The concrete plant is seen on the far bank. The rising water of Lake Wisconsin upstream from the dam is ...
Looking Upstream through Lock at Power Dam
November 1, 1913
Wooden forms are in place for construction of the walls of the lock at the Prairie du Sac dam. The newly constructed power house is on the left.