click zoom to display a high-res image
A Big 'Pipe Job'
Image
It takes a special "plumber" to put together pipes the size of these being installed in the heating tunnel under construction on N. Charter Street to carry steam from the new UW heating plant to the university distribution system at the old plant. The pipes have inside diameters of 18 to 20 inches.
May 27, 1959
Stein, Edwin
Publication Information
Physical Description
Collection Information
Copyright Information
W012FDM
WHi 142357
Image
Digital Collections
Explore more than 100,000 collection items online through the Society’s digital collections. For over two decades, we’ve been scanning, photographing, and digitizing materials from our collections, creating a rich and growing digital archive that brings history closer to you.
The Wisconsin Historical Society offers an ever-growing digital collection. Digitized materials reflect the full range of items in the collections including photographs, letters, newsletters, films, posters, architectural drawings, menus, and ephemera.
Attribution
For a credit line: Wisconsin Historical Society, Creator, Title, Unique Identifier.
The Unique Identifier can be found at the top or bottom of the page for each item. The name of a downloaded file is NOT the unique identifier.
For bibliographic citations please consult the UW-Madison Libraries Citation Research Guide to ensure compliance with appropriate style guidelines.
Accessing Collections
The vast majority of the items in our collections are not online. The Society owns thousands of archival collections viewable in our Archives reading room. To view and conduct research in our collections, visit us in person.
New U.W. Heating Plant
February 18, 1959
The three large boilers in the recently completed University of Wisconsin heating plant on Charter Street.
New U.W. Heating Plant
February 18, 1959
Exterior of the recently completed University of Wisconsin heating plant on Charter Street.
New U.W. Heating Plant
February 18, 1959
Frank Kasiniski of Madison, right, and Wilburn Gibson of Detroit, MI, inspecting the second level of the newly completed University of Wisconsin heating plant on Charter Street.
New U.W. Heating Plant
February 18, 1959
Workers Frank Kasiniski and Wilburn Gibson inspecting the generator and turbine room at the new University of Wisconsin heating plant located on Charter Street.
Ventilation Pipes
August 26, 1930
Ventilation pipes in the basement of Nakoma Country Club.
Ventilation Pipes
August 26, 1930
Ventilation pipes and furnace in basement of Nakoma Country Club.