Photograph

Shooting Concrete from Elevated Road at Power Dam

Date: 05 17 1912
Description: Workmen pouring concrete from the elevated railroad into forms below.
Photograph

Concrete Buttresses and Apron at East End of Power Dam

Date: 05 31 1912
Description: Forms have been removed, revealing the newly poured buttresses and apron. A man is pushing a cart on the elevated road.
Photograph

Crew at Power Dam Waiting for Dinner

Date: 05 31 1912
Description: Workmen posing outside the dining hall before dinner.
Photograph

General View, Looking East of Work on Power Dam

Date: 06 16 1912
Description: Elevated view of steam powered pile drivers at work on the coffer dam.
Photograph

East End of Power Dam

Date: 06 30 1912
Description: Newly poured concrete buttresses and apron at the east end of the power dam on the downstream side.
Photograph

General View of Power House Coffer Dam and High Trestle

Date: 07 16 1912
Description: An overview, from the west bank, of the power dam construction site. The high trestle is in the background, and the narrow gauge electric railroad is in th...
Photograph

Big Boiler and Engine to Run Centrifugal Pump

Date: 07 16 1912
Description: Workmen pose around the "big boiler" and engine that power the 12 inch centrifugal pump used to pump out the coffer dam at the power dam construction site.
Photograph

Excavating in West End of Power House Coffer Dam

Date: 07 25 1912
Description: A boy posing in the excavation site for the power house within the coffer dam. He is standing on the narrow gauge tracks; the high trestle is in the backgr...
Photograph

Northeast View of Power House Coffer Dam at Power Dam

Date: 08 07 1912
Description: Men excavating within the coffer dam. One man is standing on a high piling. Several steam engines at work fill the air with smoke. The high trestle and fou...
Photograph

Dining Hall at Power Dam Camp

Date: 08 18 1912
Description: Eight cooks posing inside the dining hall. Long tables are set for a meal.
Photograph

Northeast View of Interior of Power House Coffer Dam

Date: 09 30 1912
Description: Pile drivers working within the confines of the coffer dam. Men are on the high trestle constructing chutes for pouring concrete.
Photograph

Concrete Mixers and Hoisting Crane, East End of Power Dam

Date: 10 17 1912
Description: Concrete plant at east end of the dam, showing the mixers, crane, and a rail car at the abutment.
Photograph

Erecting Gate Guides in Power House at Power Dam

Date: 11 02 1912
Description: Workmen using a crane to erect the gate guides for the power house.
Photograph

Erecting Draft Tubes in Power House at Coffer Dam

Date: 11 02 1912
Description: Workmen posing during erection of the draft tubes for the power house at the Prairie du Sac dam.
Photograph

General View of Power House Coffer Dam at Power Dam

Date: 11 21 1912
Description: Elevated view of the progress of construction within the coffer dam showing the gate guides and draft tubes in place. Concrete forms and chutes, as well as...
Photograph

Elevated View of Power House Coffer Dam

Date: 12 29 1912
Description: Elevated view of the progress within the coffer dam showing concrete forms around the draft tubes and gate guides. The high trestle is seen extending to th...
Photograph

Brush Mats Used to Prevent Sand Washing Away at Power Dam

Date: 02 08 1913
Description: A winter view with workers posing with brush mats at the power dam construction site. The gate guides and high trestle form the background.
Photograph

Wreck of High Trestle at Power Dam

Date: 03 19 1913
Description: A view, looking east, of the wreckage of the high trestle caused by flooding and ice. The concrete plant is visible on the far bank.
Photograph

Electric Cars at Power Dam

Date: 04 07 1913
Description: Five men, two well-dressed, posing on electric rail cars during construction of the dam.
Photograph

First Story of Generator Room of Power House at Power Dam

Date: 05 17 1913
Description: Progress on the power house construction, with the east portion of the wall complete, and men working on forms for the rest of the wall.