Search the Wisconsin Historical Society's collections

Searching for

Refine by

Results 61-80 of 203

Photograph

Narrow Gauge Trestle and Pile Drivers at Prairie du Sac Dam Site

Date: 06 19 1911
Description: Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the a...
Photograph

Centrifugal Sand Pump at Work at Power Dam

Date: 07 01 1911
Description: A steam-powered centrifugal sand pump at work on the Wisconsin River during the construction of the power dam. Pilings of the coffer dam are visible in the...
Photograph

Driving Pilings for the Coffer Dam at Prairie du Sac Power Dam Site

Date: 07 20 1911
Description: Workmen stand on a barge carrying a steam-powered pile driver. The pilings will form the coffer dam necessary for construction of the power plant on the Wi...
Photograph

Work on Coffer Dam for Power House and Locks

Date: 09 12 1911
Description: An overview of the dam site on the Wisconsin River from the west shore. Three pile drivers are at work on the coffer dam. The railroad trestle is in the ...
Photograph

Work on Coffer Dam for Power House and Locks

Date: 09 18 1911
Description: Elevated view of pile drivers at work on the coffer dam. Pilings are also floating within the confines of the dam. The shoreline can be seen in the backgro...
Photograph

Workers on Pile Driver

Date: 09 23 1911
Description: Workers standing on the barge-mounted, steam-driven pile driver at work on the coffer dam.
Photograph

Destruction of Trestle Works by High Water

Date: 10 07 1911
Description: Workers attempt to secure the trestle against high water on the Wisconsin River during construction of the power dam.
Photograph

Gravel at Prairie du Sac Power Dam

Date: 10 07 1911
Description: Two men in a boat approaching a wooden gravel bin at the construction site. Other men are watching from atop the structure and from the shore.
Photograph

High Water at Prairie du Sac Dam

Date: 10 11 1911
Description: Elevated view of high water on the Wisconsin River which has inundated the coffer dam at the construction site. The narrow gauge railroad (curved line in f...
Photograph

Extension Railroad to Power Dam Under High Water

Date: 10 12 1911
Description: Two men are standing on the tracks of the newly constructed railroad extension to the construction site of the Prairie du Sac dam. Behind them, the tracks...
Photograph

Railroad to Power Dam Washed Out by Flood

Date: 10 18 1911
Description: Receding flood waters reveal destruction of the railroad extension to the power dam construction site.
Photograph

Railroad to Power Dam Washed Out by Flood

Date: 10 18 1911
Description: Workmen standing on damaged and partly submerged railroad track on the west shore of the Wisconsin River.
Photograph

Diver at Work at Power Dam

Date: 11 05 1911
Description: A diver and team working to inspect the coffer dam for underwater damage caused by flooding.
Photograph

Electric Railroad Across River on Ice at Power Dam

Date: 01 20 1912
Description: Elevated view of two men standing on a rail car on the narrow gauge electric railroad crossing the river at the dam construction site. The portion of track...
Photograph

Foundation Piles and Concrete Forms at East End of Power Dam

Date: 03 03 1912
Description: Two women and a man posing among the timber pilings near the east shore of the river. Wooden concrete forms and two buildings are in the background.
Photograph

Steam Shovel Loading Electric Cars with Gravel

Date: 04 13 1912
Description: Workmen operating a steam shovel loading gravel into electric rail cars during construction of the power dam.
Photograph

Diver at Work at Power Dam

Date: 04 12 1912
Description: A diver posing with other workmen at the power dam construction site prior to assessing underwater damage.
Photograph

Work on East End of Power Dam

Date: 05 09 1912
Description: Men with shovels working downstream from the east abutment, while other men are looking on.
Photograph

Concrete Forms at East End of Power Dam

Date: 05 10 1912
Description: Work progresses on the wooden concrete forms at the east side of the river. The steam-powered pile drivers are also visible.
Photograph

Foundation Pilings, Elevated Road, and Concrete Shots

Date: 05 17 1912
Description: Men working from the elevated road on the east end of the power dam, constructing shots (chutes) for the concrete.

Have Questions?

If you didn't find the material you searched for, our Library Reference Staff can help.

Call our reference desk at 608-264-6535 or email us at: